My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt14 West Yost Associates, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2014
>
Agmt14 West Yost Associates, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2017 2:42:54 PM
Creation date
4/16/2014 12:51:48 PM
Metadata
Fields
Template:
Agreement
Contractor Name
West Yost Associates, Inc.
PROJECT NAME
Bair Island Storm Water Pump Station Project
RMP File Number
304
Date
3/25/2014
MO Ref
14-038, 17-068
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT "A" <br />SCOPE OF SERVICES AND FEE <br />Additional Tasks during Construction Phase: <br />Task 2.11 — Additional Work to Process and Coordinate Shop Drawing and <br />Product Data Submittals: Consultant shall process all submittals through its web - <br />based document control system. Incoming — design related submittals will be <br />electronically forwarded to the Design Engineer for their review and approval, and non - <br />design related submittals shall be reviewed by Consultant. A submittal log will be <br />automatically generated by the doc control system and be used to track reviews and <br />approval stages. The outgoing submittals shall be reviewed by Consultant to confirm <br />completeness and to prevent changes from occurring during the submittal process <br />Deliverable: Submittal Log <br />Schedule: Ongoing throughout project <br />Task Budget: <br />Position Hourly Rate Estimated HoursAmount <br />Construction Manager $ 177.00 0 $ - <br />Inspector $ 123.00 20 $ 2,460.00 <br />TOTAL $ 2,460.00 <br />Task 2.12 — Additional Work to Process and Coordinate the Responses to <br />Requests for Information (RFIs): Consultant shall process all RFIs through its web - <br />based document control system. Consultant shall review each incoming RFI to <br />determine if it can be responded by referring the Contractor to the Contract Documents. <br />If not, the RFI will be electronically routed to the Design Engineer for their response. An <br />RFI Log will be automatically generated by the doc control system and used to track <br />receipt and response back to the Contractor. If an RFI question and response appears <br />to result in extra work, Consultant shall assign a Potential Change Order (PCO) number <br />to the issue and will use this file number to track final resolution of the item. <br />Deliverable: RFI Log <br />Schedule: Ongoing throughout project <br />Task Budaet: <br />Position Hourly Rate Estimated Hours Amount <br />Construction Manager $ 177.00 0 $ - <br />$ 4,920.00 <br />Inspector $ 123.00 40 <br />TOTAL $ 4,920.00 <br />REV: 03-28-17 VR <br />Page 3 of 7 <br />ATTY/AGR.Amend No. 1 !West Yost - Construction Management <br />
The URL can be used to link to this page
Your browser does not support the video tag.