My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt14 Mark Thomas & Company, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2014
>
Agmt14 Mark Thomas & Company, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2014 1:43:25 PM
Creation date
4/16/2014 1:43:23 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Mark Thomas & Company, Inc.
PROJECT NAME
Stulsaft Park Retaining wall project
RMP File Number
304
MO Ref
14-035
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Hours for bid support and construction support are budget hours. Hours for Task 5 <br /> will be billed on a time and material basis. <br /> TASK 6—SLOPE STABILITY ANALYSIS (OPTIONAL) <br /> Consultant will provide supplemental investigation to characterize landslide and perform <br /> slope stability analysis, if required, through the result of the initial geotechnical <br /> investigation in Task 3 upon approval by the City. <br /> 6.1 Hand dig 2 shaft excavation holes to 30 feet below grade. <br /> 6.2 CSA log holes, grab slide plane samples and prepare cross section. <br /> 6.3 Provide laboratory testing for slope stability. <br /> 6.4 Provide slope stability analysis calculations. <br /> 6.5 Prepare a report on slope stability analysis and required design <br /> parameters. <br /> **See attached documents for Project Schedule, Fees and Labor Rates. <br /> REV:02-21-14 VR <br /> Page 14 of 17 <br /> ATTY/AGR.2014.019/Mark Thomas&Company, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.