My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2014-04-28
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2014
>
AgdaPkt 2014-04-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2017 1:20:45 PM
Creation date
4/24/2014 5:32:03 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
4/28/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
9.A. - Page 42 <br /> Main Street Site <br /> Garage Cost Estimate <br /> Description: Main Street Lot <br /> Spaces/floor 85 <br /> • Site Area (SF) 30,000 <br /> New Structure Levels 5 <br /> -°▪1a Total spaces 425 <br /> v <br /> txo Ground Floor Ceiling Height 15 <br /> n3 Existing Spaces 111 <br /> Total floor area 150,000 <br /> Total parking spaces 425 <br /> Net Added new spaces 314 <br /> SF/space 353 <br /> Base Construction Costs $ 8,201,994 <br /> Base construction cost/SF $ 55 <br /> , Overhead,contingency, bond,and <br /> u insurance costs(45%) 45% $ 3,690,897 <br /> o Design and Engineering (18%) 18% $ 2,140,720 <br /> Escalation (4%) 4% $ 561,344 <br /> c Total Construction Cost $ 14,595,011 <br /> coy Cost/SF $ 97 <br /> Cost/Stall $ 34,341 <br /> Cost/Net new stall $ 46,481 <br /> Garage Cost Estimate <br /> Description: Main Street JD <br /> Spaces/floor 85 <br /> Site Area (SF) 30,000 <br /> New Structure Levels 3 <br /> -aa Total spaces 255 <br /> v <br /> txo Ground Floor Ceiling Height 15 <br /> co Existing Spaces 0 <br /> Total floor area 90,000 <br /> Total parking spaces 255 <br /> Net Added new spaces 255 <br /> SF/space 353 <br /> Base Construction Costs $ 5,307,936 <br /> Base construction cost/SF $ 59 <br /> , Overhead,contingency, bond,and <br /> u insurance costs(45%) 45% $ 2,388,571.20 <br /> o Design and Engineering (18%) 18% $ 1,385,371 <br /> L Escalation (4%) 4% $ 363,275 <br /> c Total Construction Cost $ 9,445,213 <br /> coy Cost/SF $ 105 <br /> Cost/Stall $ 37,040 <br /> Cost/Net new stall $ 37,040 <br />
The URL can be used to link to this page
Your browser does not support the video tag.