Laserfiche WebLink
9.A. - Page 43 <br /> Garage Cost Estimate <br /> Description: JPB Main Footprint <br /> Spaces/floor 160 <br /> Site Area (SF) 60,650 <br /> New Structure Levels 3 <br /> -°1a Total spaces 480 <br /> v <br /> Ground Floor Ceiling Height 20 <br /> 13 Existing Spaces 71 <br /> Total floor area 181,950 <br /> Total parking spaces 480 <br /> Net Added new spaces 409 <br /> SF/space 379 <br /> Base Construction Costs $ 8,386,353 <br /> Base construction cost/SF $ 46 <br /> , Overhead,contingency, bond,and <br /> u insurance costs(45%) 45% $ 3,773,859 <br /> o Design and Engineering (18%) 18% $ 2,188,838 <br /> L Escalation (4%) 4% $ 573,962 <br /> c Total Construction Cost $ 14,923,058 <br /> 33 Cost/SF $ 82 <br /> Cost/Stall $ 31,090 <br /> Cost/Net new stall $ 36,487 <br /> Garage Cost Estimate <br /> Description: JPB Annex Footprint <br /> Spaces/floor 45 <br /> • Site Area (SF) 17,350 <br /> • New Structure Levels 3 <br /> -°▪1a Total spaces 135 <br /> v <br /> txo Ground Floor Ceiling Height 20 <br /> co Existing Spaces 0 <br /> Total floor area 52,050 <br /> Total parking spaces 135 <br /> Net Added new spaces 135 <br /> SF/space 386 <br /> Base Construction Costs $ 3,992,369 <br /> Base construction cost/SF $ 77 <br /> , Overhead,contingency, bond,and <br /> u insurance costs(45%) 45% $ 1,796,566 <br /> o Design and Engineering (18%) 18% $ 1,042,008 <br /> L Escalation (4%) 4% $ 273,238 <br /> c Total Construction Cost $ 7,104,258 <br /> 8 Cost/SF $ 136 <br /> Cost/Stall $ 52,624 <br /> Cost/Net new stall $ 52,624 <br /> Parking Facility Screening Memorandum 031114.docx <br />