My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2014-04-28
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2014
>
AgdaPkt 2014-04-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2017 1:20:45 PM
Creation date
4/24/2014 5:32:03 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
4/28/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
9.A. - Page 43 <br /> Garage Cost Estimate <br /> Description: JPB Main Footprint <br /> Spaces/floor 160 <br /> Site Area (SF) 60,650 <br /> New Structure Levels 3 <br /> -°1a Total spaces 480 <br /> v <br /> Ground Floor Ceiling Height 20 <br /> 13 Existing Spaces 71 <br /> Total floor area 181,950 <br /> Total parking spaces 480 <br /> Net Added new spaces 409 <br /> SF/space 379 <br /> Base Construction Costs $ 8,386,353 <br /> Base construction cost/SF $ 46 <br /> , Overhead,contingency, bond,and <br /> u insurance costs(45%) 45% $ 3,773,859 <br /> o Design and Engineering (18%) 18% $ 2,188,838 <br /> L Escalation (4%) 4% $ 573,962 <br /> c Total Construction Cost $ 14,923,058 <br /> 33 Cost/SF $ 82 <br /> Cost/Stall $ 31,090 <br /> Cost/Net new stall $ 36,487 <br /> Garage Cost Estimate <br /> Description: JPB Annex Footprint <br /> Spaces/floor 45 <br /> • Site Area (SF) 17,350 <br /> • New Structure Levels 3 <br /> -°▪1a Total spaces 135 <br /> v <br /> txo Ground Floor Ceiling Height 20 <br /> co Existing Spaces 0 <br /> Total floor area 52,050 <br /> Total parking spaces 135 <br /> Net Added new spaces 135 <br /> SF/space 386 <br /> Base Construction Costs $ 3,992,369 <br /> Base construction cost/SF $ 77 <br /> , Overhead,contingency, bond,and <br /> u insurance costs(45%) 45% $ 1,796,566 <br /> o Design and Engineering (18%) 18% $ 1,042,008 <br /> L Escalation (4%) 4% $ 273,238 <br /> c Total Construction Cost $ 7,104,258 <br /> 8 Cost/SF $ 136 <br /> Cost/Stall $ 52,624 <br /> Cost/Net new stall $ 52,624 <br /> Parking Facility Screening Memorandum 031114.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.