My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2014-04-28
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2014
>
AgdaPkt 2014-04-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2017 1:20:45 PM
Creation date
4/24/2014 5:32:03 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
4/28/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.1.A. - Page 19 <br /> constraints--and shall provide Spanish translation of meeting displays and the <br /> PowerPoint translation as needed. Consultant shall develop meeting agendas, <br /> comment cards, in Spanish and English as needed, as well as a glossary of <br /> planning terms, if needed. <br /> Staffing the Meetings. Consultant shall provide 2 persons who shall be bi-lingual to <br /> assist at the meetings with set-up, breakdown, sign-in. Consultant shall provide sign- <br /> in sheets, agendas, comment cards, and the preparation of handouts, including <br /> writing and design. We shall provide experienced facilitators, up to two as needed. <br /> As an alternative, we can also provide a facilitator and graphic recorder who can <br /> capture meeting comments/questions and answers in real-time on wall-sized paper <br /> using colorful markers. This creates a sense of the history, and visually <br /> demonstrates that all comments shall be valued. it also avoids excessive repetition <br /> of comments and can be used by the Consultant facilitator, or staff, to provide a <br /> meeting wrap-up, summary of comments, at the meeting's conclusion. <br /> Meeting Summary. Consultant shall provide a visually-pleasing (graphically <br /> designed) written meeting summary incorporating photos of participants, project <br /> background, format, meeting displays, discussion, all questions/comments, and <br /> next steps. <br /> Deliverables: <br /> • Electronic (HTML) version and artwork of the meeting notice/invitation and poster <br /> • List of completed phone calls and copies of emails to community organizations and <br /> key stakeholders <br /> • Staffing for two community meetings <br /> • Meeting materials, including agenda, sign-in sheets, and comment cards <br /> • Meeting Summary <br /> Task 6: Potholing <br /> The Consultant shall conduct potholing for this project to locate existing underground <br /> utilities and avoid potential underground utility conflicts. Quotations shall be sought from <br /> potholing contractors for this work as potholing needs arise and at a cost not to exceed <br /> $12,000.00. <br /> Task 7: Construction Enqineerinq/Support <br /> The Consultant shall provide the following assistance during bidding of the project: <br /> Attend a pre-bid meeting with the City, if needed <br /> e Review and respond to inquiries by Contractors during bidding via email to the City <br /> I> Prepare any addenda to the plans and specs prepared by Consultant in electronic copy <br /> pdf format <br /> The Consultant shall provide the following assistance during construction of the project: <br /> G> Attend pre-construction meeting, if requested by Redwood City. <br /> t- Assist contractor with plan interpretation during construction. <br /> Prepare minor addenda to clarify plan intent. <br /> REV:04-11-14 VR <br /> Page 16 of 20 <br /> ATTY/AG R.2014.05 31TJ KM_175742 <br />
The URL can be used to link to this page
Your browser does not support the video tag.