My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2014-04-28
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2014
>
AgdaPkt 2014-04-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2017 1:20:45 PM
Creation date
4/24/2014 5:32:03 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
4/28/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.1.A. - Page 20 <br /> Review site development submittals and shop drawings related to the design scope of <br /> work. <br /> During construction, we shall make up to three (3) site visits to review the progress and <br /> quality of construction and to determine, in general, whether the project is progressing <br /> according to the design intent and construction documents. <br /> Participate in final inspection and assist with developing a final "punch list"of <br /> deficiencies, if requested by Redwood City. <br /> r- Prepare record drawings in AutoCAD format on Mylar of the Contractor's redline <br /> markups and Consultant field review. <br /> Deliverables:Addenda in.pdf format; <br /> Comments on submittals;and <br /> Record drawings in Mylar and.dwg and.pdf formats. <br /> Task 8: Traffic Signal Upgrade at Hudson/Jefferson Intersection Design <br /> Consultant shall prepare traffic signal modification plans for the full upgrade of all the <br /> traffic signal poles at the intersection of Hudson Street and Jefferson Avenue. <br /> Consultant shall show a removal plan illustrating the poles being removed and salvaged <br /> on a 1"=50' scale insert within the signal layout plan, which is at a 1"=20' scale. The <br /> signal plan layout shall show new signal poles being installed and any new signal <br /> equipment added onto the new poles and any cabinets being upgraded, if needed. <br /> Consultant shall coordinate with PG&E for a disconnect/reconnect application if the <br /> service cabinet is upgraded. The submittal rounds for review shall be the same as the <br /> review rounds for tasks 2 through 4. <br /> Task 8.1 Bidding and Construction Support Services <br /> Consultant shall provide the following assistance during bidding pertaining to this task: <br /> Review and respond to inquiries by Contractors during bidding via email to the City <br /> Prepare addendums to the plans and specs prepared by Consultant in electronic copy <br /> .pdf format <br /> Consultant shall provide the following assistance during construction for this task: <br /> r, Assist contractor with plan interpretation during construction. <br /> Prepare minor addendums to clarify plan intent. <br /> Review up to 10 site development submittals and shop drawings related to the design <br /> scope of work. <br /> rT Participate in final inspection and assist with developing a final "punch list"of <br /> deficiencies, if requested by RWC. <br /> 1> Prepare record drawings in AutoCAD format on Mylar of the Contractor's redline <br /> markups and Consultant field review. <br /> *`r Deliverables:Addendums in .pdf format; <br /> Comments on submittals;and <br /> Record drawings in Mylar and.dwg and.pdf format. <br /> REV:04-11-14 VR <br /> Page 17 of 20 <br /> ATTY/AG R.2014.0531TJ K M_175742 <br />
The URL can be used to link to this page
Your browser does not support the video tag.