Laserfiche WebLink
7.1.A. - Page 23 <br /> EXHIBIT "B" <br /> Fee Schedule <br /> Consultant shall perform the work for a not-to-exceed amount of $175,742. Consultant shall <br /> invoice monthly based on hours of work performed for each task consistent with the estimated <br /> hours and costs outlined in the table below. Hours and costs may be reallocated between the <br /> various tasks items as needed, provided that the total project shall not exceed $175,742. <br /> TJKM <br /> Job Title Hourly Rate <br /> PIC $200.00 <br /> QA/QC $200.00 <br /> Project Task Leader $200.00 <br /> Lead Designer $145.00 <br /> Project Engineer $135.00 <br /> Graphics $70.00 <br /> Cost Proposal <br /> TJKM Total TJKM Other Sub- <br /> Tasks Contractor Total Fee <br /> Labor Costs Direct Costs <br /> Total Costs <br /> # Task Description <br /> 1 Project initiation and Management/Meetings $8,200 $150 $2,036 $10,386 <br /> 2 Project Setup and Initial Design(35%submittal) $9,120 $50 $17,868 $27,038 <br /> 3 75%Design Submittal $0 <br /> Plans $14,250 $50 $10,112 $24,412 <br /> Specs $2,400 $1,670 $4,070 <br /> Estimate $810 $0 $810 <br /> 4 Final Design 100%submittal $0 <br /> Plans $8,350 $150 $4,290 $12,790 <br /> Specs $800 $1,005 $1,805 <br /> Estimate $540 $0 $540 <br /> 5 Public Outreach(1 mtg) $3,490 $200 $13,880 $17,570 <br /> 6 Potholing allowance $0 $12,000 <br /> 7 Construction Engineering Support $0 <br /> 7.1 Bid Support $1,560 $399 $1,959 <br /> 7.2 Construction Services $7,960 $200 $2,834 $10,994 <br /> 8 Traffic Signal atHudson/Jefferson $15,500 $300 $0 $15,800 <br /> 8.1 Signal Construction Support $3,960 $200 $0 $4,160 <br /> 9 Traffic Signal at Woodside/Hess $17,500 $300 $0 $17,800 <br /> 9.1 Signal Construction Support $3,960 $200 $0 $4,160 <br /> 9.2 Civil ADA ramp design $0 $8,312 $8,312 <br /> 9.3 Civil Construction Support $0 $1,136 $3,136 <br /> NOT TOEXCEEDTOTALS $98,400 $1,800 $75,542 $175,742 <br /> REV:04-11-14 VR <br /> Page 20 of 20 <br /> ATTY/AG R.2014.053/TJ KM_175742 <br />