My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt14 Bayside Stripe & Seal, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2014
>
Agmt14 Under 60K
>
Agmt14 Bayside Stripe & Seal, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2014 3:08:29 PM
Creation date
5/6/2014 3:08:21 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Bayside Stripe & Seal, Inc.
PROJECT NAME
Brewster Avenue Bicycle Improvements- Signing and striping project
RMP File Number
304.5
Date
5/5/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� �. <br /> SECTION 00800 <br /> SPECIAL CONDITIONS <br /> 1.01 HOURS OF CONSTRUCTION <br /> A. Working hours shall be from 7:30 a.m. to 4 p.m. Monday through Friday, unless otherwise specified for <br /> off-peak hours. <br /> B. City reserves the right to adjust working hours if necessitated to avoid project-related traffic delays and <br /> congestion. <br /> C. Contractor shall avoid working in the vicinity of Sequoia high School during scheduled school arrival and <br /> dismissal periods. <br /> 1.02 PLANS <br /> A. Those certain plans entitled, BREWSTER AVENUE BICYCLE IMPROVEMENTS - SIGNING AND <br /> STRIPING PROJECT; <br /> B. The City's Engineering Standards; <br /> C. State of California, Department of Transportation, Standard Specifications and Plans, are hereby made a <br /> part of this contract. <br /> 1.03 TIME OF COMPLETION <br /> The work covered under these contract documents shall be diligently prosecuted in accordance with the <br /> schedule proposed by the Contractor and approved by the city to insure completion within twenty-one <br /> (21)calendar-days from the date of Notice to Proceed. <br /> 1.04 GENERAL TRAFFIC CONTROL,SAFETY&ACCESS <br /> A. Contractors shall comply with Section 01550, Traffic Regulations, or as directed by City Engineer. <br /> B. Contractor shall provide one 11-foot minimum width traffic lane for vehicular traffic in each direction of <br /> travel during construction. <br /> C. Contractor has immediate access to the work site within the corporate limits of Redwood City. Contractor <br /> shall limit his activities within the area indicated as limits of the Contract. No work shall proceed on site <br /> unless temporary barriers,fences, gates and protection are installed and functioning. <br /> D. Contractor shall take special precautions when working in the vicinity of school grounds. <br /> 1.05 UTILITY SHUTDOWN <br /> A. No utility shall be disconnected without prior written approval of the City Engineer. <br /> B. In the event operations of this project require that there be a temporary utility shutdown, the Contractor <br /> shall submit, in writing, notice of this requirement at least forty-eight (48) hours in advance of the <br /> operation. <br /> SPECIAL CONDITIONS <br /> BREWSTER AVENUE BICYCLE IMPROVEMENTS—SIGNING AND STRIPING PROJECT 00800-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.