My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt14 Bayside Stripe & Seal, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2014
>
Agmt14 Under 60K
>
Agmt14 Bayside Stripe & Seal, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2014 3:08:29 PM
Creation date
5/6/2014 3:08:21 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Bayside Stripe & Seal, Inc.
PROJECT NAME
Brewster Avenue Bicycle Improvements- Signing and striping project
RMP File Number
304.5
Date
5/5/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i _ <br /> SECTION 01550 <br /> TRAFFIC REGULATIONS <br /> PART1 -GENERAL <br /> 1.01 OBJECTIVES <br /> A. The Contractor shall provide for safe movement of vehicular, bicycle and pedestrian tra�c, including <br /> persons with disabilities in accordance with the American's with Disabilities Act of 1990 (ADA), through <br /> and around construction operations. Tra�c control requirements set forth herein are the minimum <br /> requirements imposed. The Contractor shall be solely responsible for providing all protective measures <br /> necessary. <br /> B. Proper tra�c movement through the work area depends upon the driver controlling and directing his/her <br /> vehicle properly under unexpected situations and pedestrian attention to signs. The means of clarifying <br /> such conditions to the public include signs, flaggers, pavement markings, barricades, lights, cones and <br /> delineators. <br /> C. No one standard sequence of signs or control devices will suit all conditions, which may result from <br /> construction operations. Even for the same work the conditions may vary from hour to hour, requiring <br /> adjustment and revision of the traffic control program in effect. <br /> D. The traffic control requirements specified herein are intended to establish general principles to be <br /> observed in the control and regulation of traffic through and around construction operations anticipated for <br /> this project. All pedestrian and vehicular detours are subject to review by the police chief, sheriff or <br /> enforcement officer of the agencies having jurisdiction, and the Contractor shall revise the detours as <br /> ordered at no additional cost. <br /> E. Clean up site each day after completing work and remove all traffic hazards. Daily traffic control <br /> measures shall continue until cleanup activities have been satisfactorily completed and all of the <br /> Contractor's equipment has been removed from the traveled way area. <br /> 1.02 DESCRIPTION OF WORK <br /> Work Included: <br /> 1. At all times, the Contractor shall provide safe and adequate passage for vehicular and pedestrian <br /> traffic through, around and adjacent to all construction operations by use of detours, bridging, <br /> backfilling, paving,traffic barriers or other favorably reviewed means. <br /> 2. The Contractor shall establish and maintain detours and conduct his construction operations in <br /> such a manner as to minimize hazard, inconvenience and disruption to the public. <br /> 3. Traffic control shall be directed equally to the regulation and protection of pedestrian traffic <br /> including pedestrians, bicyclists,joggers, skaters, skateboarders, etc. <br /> 4. The Contractor shall provide for protection of pedestrians and separation of pedestrians from <br /> construction operations at all times. <br /> 5. The Contractor shall direct, divert and detour traffic through, around and adjacent to construction <br /> operations in accordance with the traffic control plans as specified herein or in accordance with <br /> favorably reviewed Traffic Control Plans. The Contractor may revise the Traffic Control Plan as <br /> necessary only with the favorable review of the Engineer. <br /> 1.03 REFERENCES <br /> TRAFFIC REGULATIONS <br /> BREWSTER AVENUE BICYCLE IMPROVEMENTS—SIGNING AND STRIPING PROJECT 01550-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.