My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt14 Bayside Stripe & Seal, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2014
>
Agmt14 Under 60K
>
Agmt14 Bayside Stripe & Seal, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2014 3:08:29 PM
Creation date
5/6/2014 3:08:21 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Bayside Stripe & Seal, Inc.
PROJECT NAME
Brewster Avenue Bicycle Improvements- Signing and striping project
RMP File Number
304.5
Date
5/5/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i _ _ _ � �.m�__u...� . <br /> A. The contract unit price for installing SIGN POST shall include full compensation for furnishing all labor, <br /> materials, tools, equipment, and incidentals for performing all the work necessary to supply and install <br /> sign posts in accordance with City Standard Engineering Detail T-4, including, but not limited to installing <br /> post, sleeve, anchor, concrete foundation, and any other miscellaneous necessary components, at the <br /> locations shown on the plans, and as directed by the City Engineer. <br /> B. Full compensation for concrete post foundations shall be included in the contract unit price for sign posts <br /> and shall include, but not be limited to layout, underground utility investigations/USA markings, <br /> excavation, removal and disposal of excavated materials, and concrete, and no additional compensation <br /> will be allowed therefore. <br /> C. Payment will be made on the basis of the actual quantity of sign posts installed. Contractor and City <br /> Inspector will measure and record installed quantities for basis of payment. <br /> D. Full compensation for all additional materials and labor, not shown on the plans or specified, which are <br /> necessary to complete the installations shall be considered as included in the contract unit prices paid for <br /> sign posts, and no additional compensation will be allowed therefore. <br /> 1.07 PARKING METER POST(BID ITEM NO. 31) <br /> A. The contract unit price for installing PARKING METER POST shall include full compensation for <br /> furnishing all labor, materials, tools, equipment, and incidentals for performing all the work necessary to <br /> supply and install parking meter posts in accordance with City Standard Engineering Detail T-8, including, <br /> but not limited to layout, underground utility investigations, excavation, disposal of excavated materials, <br /> concrete foundation, and setting posts at the locations shown on the plans, and as directed by the City <br /> Engineer. <br /> B. Payment will be made on the basis of the actual quantity of ineter posts installed. Contractor and City <br /> Inspector will measure and record installed quantities for basis of payment. <br /> C. Full compensation for all additional materials and labor, not shown on the plans or specified, which are <br /> necessary to complete the installations shall be considered as included in the contract unit prices paid for <br /> parking meter post, and no additional compensation will be allowed therefore. <br /> * , * <br /> MEASUREMENT&PAYMENT <br /> BREWSTER AVENUE BICYCLE IMPROVEMENTS—SIGNING AND STRIPING PROJECT 01200-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.