My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2014-05-12 Joint with Planning
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2014
>
AgdaPkt 2014-05-12 Joint with Planning
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2014 10:20:56 AM
Creation date
5/8/2014 4:38:52 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council
Date
5/12/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
519
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.1.G. - Page 60 <br /> MITIGATION MONITORING OR REPORTING PROGRAM <br /> 1410 VALOTA ROAD RESIDENTIAL PROJECT <br /> Responsibility <br /> Impact Mitigation Timeframe for for Oversight of <br /> Implementation Implementation Implementation <br /> GEOLOGY AND SOILS <br /> Impact GEO-1: • Excavation and grading work will be scheduled in dry weather During all phases of Project applicant Community <br /> Implementation of the months to the extent feasible,to prevent excess erosion runoff demolition,grading, and contractors. Development Director <br /> proposed project into the creek. Grading and construction activities shall be and construction. <br /> would result in completed to avoid impacts to nesting birds,pursuant to MM <br /> increased erosion and B10-1,1. Excavation and grading work that is scheduled in wet <br /> loss of top soil until weather months will be weatherized to withstand or avoid erosion <br /> the project is throughout the project construction. <br /> constructed. <br /> Significant Impact. • Stockpiles and excavated soils will be covered with secured tarps <br /> or plastic sheeting. <br /> Less Than Significant with Mitigation. <br /> HYDROLOGY AND WATER QUALITY <br /> Impact HYD-1: •Burlap hags filled with drain rock will be installed around storm During all phases of Project applicant Community <br /> Construction activities drains to route sediment and other debris away from the drains. demolition,grading, and contractors. Development Director <br /> could temporarily • Earthmoving or other dust-producing activities would be and construction. <br /> increase pollutant suspended during periods of high winds. <br /> loads in stotmwater •All exposed or disturbed soil surfaces would be watered at least <br /> runoff. Significant twice daily to control dust as necessary. <br /> Impact. • Stockpiles of soil or other materials that can be blown by the wind <br /> would be watered during the dry season to prevent wind erosion. <br /> Stockpiles of soil or other materials shall be covered during the <br /> wet season to prevent stormwater pollution runoff. <br /> •All trucks hauling soil,sand,and other loose materials would be <br /> covered and all trucks would be required to maintain at least two <br /> feet of freeboard. <br /> 1410 Valota Road Residential Project February 2012 <br /> Mitigation Monitoring or Reporting Program page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.