Laserfiche WebLink
7.1.G. - Page 61 <br /> MITIGATION MONITORING OR REPORTING PROGRAM <br /> 1410 VALOTA ROAD RESIDENTIAL PROJECT <br /> Responsibility <br /> Impact Mitigation Timeframe for for Oversight of <br /> Implementation Implementation <br /> HYDROLOGY AND WATER QUALITY Continued <br /> See previous page. •The construction site would be swept daily to minimize wind See previous page. See previous See previous page. <br /> erosion and reduce water pollution. All paved access roads, page. <br /> parking areas,staging areas and residential streets adjacent to the <br /> construction site would be swept daily. <br /> Vegetation in disturbed areas would be replanted as quickly as <br /> possible. <br /> Less Than Significant Impact with Mitigation. <br /> NOISE <br /> Impact NOM: Lots 1 Prior to the issuance of building permits,a detailed acoustical Prior to the Project applicant. Community <br /> and 2 of the proposed analysis,in conformance with California Noise Insulation issuance of Development Director <br /> project could be Standards in Title 24,Part 2 of the California Code of regulations building permits. <br /> exposed to exterior (California Building Code),will be required for final design of the <br /> noise levels that are in proposed dwelling units at Lots I and 2. The project will <br /> excess of the City's incorporate sound control treatments to meet an interior Lan of 45 <br /> normally acceptable dBA or less(with the windows closed)to the satisfaction of the <br /> noise levels for City Building Official. <br /> residential medium- <br /> density development. Less Than Significant impact with Mitigation. <br /> Interior noise exposures <br /> at Lot I and Lot 2 <br /> could,therefore,exceed <br /> the City of Redwood <br /> City and Title 24 noise <br /> standards. Significant <br /> Impact. <br /> 1410 Valota Road Residential Project February 2012 <br /> Mitigation Monitoring or Reporting Program page 5 <br />