7.1.G. - Page 62 <br /> MITIGATION MONITORING OR REPORTING PROGRAM <br /> 1410 VALOTA ROAD RESIDENTIAL PROJECT <br /> Responsibility <br /> Impact Mitigation Timeframe for for Oversight of <br /> Implementation Implementation Implementation <br /> NOISE <br /> Impact NOI-2: •Noise-generating activities at the construction site will be During all phases of' Project applicant Community <br /> Construction of the restricted to the hours between 7:00 AM and 8:00 PM,Monday demolition,grading, and contractors. Development Director <br /> proposed project would through Friday. No construction activities will occur on and construction. <br /> expose nearby Saturdays,Sundays,or City holidays. <br /> residents to temporary •Equip all internal combustion engine driven equipment with intake <br /> elevated noise levels. and exhaust mufflers which are in good condition and appropriate <br /> Significant for the equipment. <br /> Temporary Impact. •Locate stationary noise generating equipment as far as possible <br /> from adjacent residential land uses. <br /> •Acoustically shield stationary equipment located near existing <br /> residential land uses. <br /> •Utilize"quiet"air compressors and other stationary noise sources <br /> where technology exists. <br /> •The contractor shall prepare a detailed construction plan <br /> identifying the schedule for major noise-generating construction <br /> activities. The construction plan shall identify a procedure for <br /> coordination with the adjacent noise sensitive facilities so that <br /> construction activities can be scheduled to minimize noise <br /> disturbance. <br /> •Designate a"disturbance coordinator"who would be responsible <br /> for responding to any local complaints about construction noise. <br /> The disturbance coordinator will determine the cause of the noise <br /> complaint(e.g.starting too early,bad muffler,etc.)and will <br /> require that reasonable measures warranted to correct the problem <br /> be implemented. <br /> •Conspicuously post a telephone number for the disturbance <br /> coordinator at the construction site and include it in the notice sent <br /> to neighbors regarding the construction schedule. <br /> 1410 Valota Road Residential Project February 2012 <br /> Mitigation Monitoring or Reporting Program page 6 <br />