Laserfiche WebLink
been properly removed or abandoned (unless the Parcel Map includes <br /> easements for said utilities). <br /> 8. Prior to Parcel Map approval, the applicant shall obtain a soils report, prepared <br /> by a licensed geotechnical engineer, in conformance with Engineering <br /> Standards, Volumes II & Ill. <br /> 9. The proposed pavement sections are subject to change if the required soils <br /> report indicates that a more substantial section is required. <br /> 10.A Tree Permit is required for the removal of any trees on private property with a <br /> trunk diameter of 12" or larger, and for the pruning or removal of any trees in the <br /> public right of way. The guidelines and permit are available on the City's website <br /> at: <br /> http://www.redwoodcily,or_gipher_iing/tree§1201/11o\OpApOvforaTreePermiLp <br /> OrN2 <br /> httpliwww.redwoodcity,orsZphed/pannn_gitre!eistpd_ffriTE::PermitApplcafion.pdf <br /> 11.Prior to building permit issuance, the applicant shall pay all applicable water, <br /> recycled water, wastewater, and traffic related fees outlined on the City's web <br /> site at <br /> http://www.redwoodpitv.orglbit/infrastructu TiLpdf/FeesandCyarges01.04 12pdf <br /> 12.The applicant/contractor shall apply for an Encroachment Permit from the <br /> Community Development Department (CDD) for work in the City public right-of- <br /> way, easements or property in which the City holds an interest. <br /> 13.Prior to issuance of an encroachment permit, the applicant shall post <br /> Performance and Labor & Materials Bonds for all improvements within City right <br /> of way and/or easements. <br /> 14.Any changes in the approved permit plans shall have prior approval of <br /> Engineering & Construction, following the "Revisions" procedure in the <br /> Engineering Standards. <br /> 15.After the City permits are approved, but before beginning construction, the <br /> owner/applicant shall hold a preconstruction conference with Engineering staff <br /> and other interested parties. The developer shall arrange for the attendance of <br /> the construction manager, contractor, and all subcontractors. <br /> 16.If the project qualifies as a C.3 regulated project, the owner/applicant shall enter <br /> into a Stormwater Treatment Measures Maintenance Agreement (STMMA)for all <br /> on-site stormwater treatment measures associated with the project prior to Parcel <br /> Map approval. <br /> ATTY/RESO,2980/PC EAST OAKWOOD DRIVE <br /> REV 0542-14 VR <br /> Page 4 of 9 <br />