My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt02 S. G. Barber Constructio
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2002
>
Agmt02 S. G. Barber Constructio
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2008 10:38:47 AM
Creation date
9/16/2002 9:49:14 AM
Metadata
Fields
Template:
Agreement
Contractor Name
S.G. Barber Construction
PROJECT NAME
utility trench repair 02-03
RMP File Number
304
Date
9/5/2002
MO Ref
02-219
Box
6600
Sticky Note
ID:
1
Text:
Pg 9 Faithful Performance Bond
Pg 11 Payment Bond
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AGREEMENT <br /> <br /> [S.G. BARBER CONSTRUCTION] <br /> <br />THE CITY OF REDWOOD CITY, a charter city and municipal corporation in the State of <br />California ("City"), and S.G. BARBER CONSTRUCTION, INC. of Belmont, California <br />("Contractor"), for the consideration hereinafter stated, hereby agree as follows: <br /> <br /> 1. Contractor shall perform everything required to be performed, shall provide and <br /> furnish all of the labor, equipment, materials, and tools to perform, for Three <br /> Hundred Sixty-five (365) calendar days after the NOTICE TO PROCEED FOR <br /> THE SERVICE REQUESTED, the following work: <br /> <br /> 2002-2003 UTILITY TRENCH REPAIR SERVICE <br /> <br /> in strict accordance with the Plans, Contract Documents and Specifications <br /> pertaining thereto and signed by the Public Works Director of Redwood City, which <br /> documents are incorporated herein and made a part of this Agreement as if herein <br /> fully set forth. <br /> <br /> 2. City shall pay to Contractor, as full consideration for the faithful performance by <br /> Contractor of the aforementioned work, the amount of One Hundred Forty <br /> Thousand and no/100 ($140,000.00), computed in accordance with Contractor.s <br /> accepted Proposal dated June 25, 2002, which accepted Proposal is incorporated <br /> herein by reference thereto as if herein fully set forth. <br /> <br /> 3. All of the work to be done shall be done under the direction and supervision of, <br /> and to the approval of, City or its authorized representative, and the work shall be <br /> done in the best workmanlike manner, conforming strictly to the provisions of the <br /> specifications and plans made thereof. <br /> <br /> 4. (a) Contractor shall comply with all applicable provisions of Section 1810 to 1815, <br /> inclusive, of the California Labor Code relating to working hours. Contractor shall, <br /> as a penalty to City, forfeit Twenty five and No/100 Dollars ($25.00) for each <br /> worker employed in the execution of the Contract by Contractor or by any <br /> subcontractor for each calendar day during which such worker is required or <br /> permitted to work more than 8 hours in any one calendar day and 40 hours in any <br /> one calendar week, unless such worker receives compensation for all hours <br /> Worked in excess of eight (8) hours at not less than 1-1/2 times the basic rate of <br /> pay. <br /> <br /> (b) Pursuant to the provision of California Labor Code, Sections 1770 et seq. <br /> Contractor and any subcontractor under him shall pay not less than the prevailing <br /> rate of per diem wages as determined by the Director of the California <br /> Department of Industrial Relations. Pursuant to the provisions of California Labor <br /> <br />F :Atty/Ag r/Ag r.061 <br />072402 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.