My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res12 15169
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res12 15169
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 7:47:08 AM
Creation date
10/11/2019 7:47:07 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
City Council
Date
2/13/2012
Description
02/13/2012 RESOLUTION N0.15169 RESOLUTION DENYING THE APPEALS FILED BY THE REDWOOD CITY CITIZENS FOR RESPONSIBLE DEVELOPMENT AND THE REDWOOD CITY LOCAL HOUSING COMMITTEE, AND UPHOLDING THE DECEMBER 13, 2011 PLANNING COMMISSION ACTIONS IN CONNECTION WITH THE CERTIFICATION OF THE ENVIRONMENTAL IMPACT REPORT AND APPROVALS OF THE PLANNED DEVELOPMENT PERMIT, VESTING TENTATIVE MAP AND MODIFICATION OF PARKING REQUIREMENTS FOR THE 2580 EL CAMINO REAL RESIDENTIAL PROJECT on November 3, 2010, Urban Housing Group ("Developer") applied for approval of a Planned Development Permit and Vesting Tentative Map to allow the demolition of the 2.5-acre project site's existing structures (a one-story bowling alley building (formerly Mel's Bowl), a historic pole sign and a large surface parking lot) and to build a 141-unit, multi-family, transit-oriented residential development with 232 parking stalls within a wrapped parking garage and storage for 47 bicycles, commonly
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
02/13/2012 <br /> ORIGINAL <br /> RESOLUTION N0.15169 <br /> RESOLUTION DENYING THE APPEALS FILED BY THE REDWOOD <br /> CITY CITIZENS FOR RESPONSIBLE DEVELOPMENT AND THE <br /> REDWOOD CITY LOCAL HOUSING COMMITTEE, AND UPHOLDING <br /> THE DECEMBER 13, 2011 PLANNING COMMISSION ACTIONS IN <br /> CONNECTION WITH THE CERTIFICATION OF THE ENVIRONMENTAL <br /> IMPACT REPORT AND APPROVALS OF THE PLANNED <br /> DEVELOPMENT PERMIT, VESTING TENTATIVE MAP AND <br /> MODIFICATION OF PARKING REQUIREMENTS FOR THE 2580 EL <br /> CAMINO REAL RESIDENTIAL PROJECT <br /> WHEREAS, on November 3, 2010, Urban Housing Group ("Developer") applied <br /> for approval of a Planned Development Permit and Vesting Tentative Map to allow the <br /> demolition of the 2.5-acre project site's existing structures (a one-story bowling alley <br /> building (formerly Mel's Bowl), a historic pole sign and a large surface parking lot) and <br /> to build a 141-unit, multi-family, transit-oriented residential development with 232 <br /> parking stalls within a wrapped parking garage and storage for 47 bicycles, commonly <br /> referred to as the 2580 EI Camino Real Residential Project (the "ProjecY'); and <br /> WHEREAS, the City has caused the preparation of an Environmental Impact <br /> Report for the proposed Project (the "EIR"), pursuant to the requirements of the <br /> California Environmental Quality Act (Public Resources Code Section 21000 et seq.; <br /> hereafter, "CEQA"), the Guidelines for Implementation of the California Environmental <br /> Quality Act (Title 14, Sections 15000 et seq. of the California Code of Regulations; <br /> hereafter, the "CEQA Guidelines"); and <br /> WHEREAS, on February 24, 2011, in accordance with CEQA, City staff issued a <br /> Notice of Preparation ("NOP") stating the City's intent to prepare the EIR, and from <br /> February 24, 2011 through March 25, 2011 the City held a public review period on the <br /> NOP; and <br /> WHEREAS, on March 1, 2011, the Planning Commission held a Scoping <br /> Session on the EIR that served as a forum for the Planning Commission and public to <br /> comment on the NOP, learn about the Project, and discuss environmental issues that <br /> should be addressed in the EIR; and <br /> WHEREAS, on May 24, 2011, at a regularly scheduled Architectural Review <br /> Committee (ARC) meeting, the ARC unanimously recommended that the Planning <br /> Commission approve the projecYs architectural design; and <br /> WHEREAS, on August 12, 2011, the Draft EIR for the Project was released by <br /> the City for a 45-day public review and comment period. The review period, which was <br /> ATTY/RES0.2201/ATTACH. i DENY APPEALS FOR 2580 EL CAMINO REAL RESO. # 15769 <br /> REV:02/13/12 MUFF #603 <br /> Page 1 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.