My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res19 15767
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
Working
>
2010-2019
>
Res19 15767
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2019 8:01:28 AM
Creation date
10/11/2019 8:01:27 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/20/2019
Description
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD CITY IDENTIFYING THE 2019-20 ROADWAY PAVEMENT MANAGEMENT PROGRAM, IN ACCORDANCE WITH THE STREETS AND HIGHWAYS CODE FOR THE ROAD MAINTENANCE AND REHABILITATION ACCOUNT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
05/20/2019 <br />RESOLUTION NO. 15767 <br />A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD <br />CITY IDENTIFYING THE 2019-20 ROADWAY PAVEMENT <br />MANAGEMENT PROGRAM, IN ACCORDANCE WITH THE STREETS <br />AND HIGHWAYS CODE FOR THE ROAD MAINTENANCE AND <br />REHABILITATION ACCOUNT <br />WHEREAS , Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 <br />(Chapter 5, Statutes of 2017) was passed by the Legislature and signed into law by the <br />Governor in April 2017 in order to address the significant multi -modal transportation <br />funding shortfalls statewide; and <br />WHEREAS , SB 1 includes accountability and transparency provisions that will <br />ensure the residents of the City of Redwood City (City) are aware of the projects proposed <br />for funding in our community and which projects have been completed each fiscal year; and <br />WHEREAS, the City must provide a list of all projects proposed to receive funding <br />from the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1, in a <br />resolution including a description and the location of each proposed project, a proposed <br />schedule for the project's completion, and the estimated useful Ife of the improvement; <br />and <br />WHEREAS, the City will receive an estimated $1,429,730 in RMRAfunding in Fiscal <br />Year 2019-2020 from SB 1; and <br />WHEREAS, maintaining and preserving the local street and road system in good <br />condition will reduce drive times and traffic congestion, improve bicycle safety, and make the <br />pedestrian experience safer and more appealing, which leads to reduce vehicle emissions <br />helping the State achieve is air quality and greenhouse gas emissions reductions goals; <br />and <br />WHEREAS, restoring roads before they fail also reduces construction time, which <br />results in less air pollution from heavy equipment and less water pollution from site run- off; <br />and <br />WHEREAS, police, fire, and emergency medical services all need safe and reliable <br />roads to react quickly to emergency calls; and <br />WHEREAS, the SB 1 project list and overall investment in our local streets and <br />roads infrastructure, with a focus on basic maintenance and safety, investing in complete <br />streets infrastructure, and using cutting edge technology, materials and practices, will have <br />significant positive co -benefits statewide. <br />ATTY/RESO.0050/CC RE50 IDENTIFYING 19-20 ROADWAY PAVEMENT MANAGEMENT PROGRAM RE50. NO. 15767 <br />REV: 05-13-19 PR MUFF NO. 701 <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.