Laserfiche WebLink
ATTY/RESO.0054/CC RESO CENTENNIAL NEIGHBORHOOD AWS INSTALLATION <br />REV: 08-14-26 VR <br />Page 1 of 2 <br />RESOLUTION NO. 16435 <br />A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF REDWOOD <br />CITY AUTHORIZING MODIFICATIONS TO STOP SIGNS AT 14 <br />INTERSECTIONS ALONG ARGUELLO ST, LENOLT ST, WARREN ST, <br />AND ALLERTON ST AS PART OF THE 2026 ANNUAL <br />MICROSURFACING PROJECT – CENTENNIAL NEIGHBORHOOD <br />WHEREAS, RWCMoves, the citywide transportation plan, was adopted in 2018 <br />with the goal to create a walking and bicycling-friendly community that provides a safe, <br />balance, and convenient transportation system; and <br />WHEREAS, the Federal Highway Administration’s (FHWA) Bikeway Selection <br />Guide (“Guide”) published in 2019 to inform decisions relating to selection of bikeway <br />types; and <br />WHEREAS, as part of Centennial Neighborhood Microsurfacing Project, City <br />intends to implement the planned bikeways in RWCMoves and install bike boulevard and <br />pedestrian improvements along neighborhood streets; and <br />WHEREAS, the City has conducted corridor improvement studies within the <br />Centennial Neighborhood to ensure the planned bicycle and pedestrian improvements <br />are consistent with the Manual on Uniform Traffic Control Devices (MUTCD) <br />recommendations for the installation of All Way STOP controls; and <br />WHEREAS, to increase pedestrian safety and for bicyclists riding on bicycle <br />boulevards, MUTCD recommends creating predictability for bicycle and pedestrian right- <br />of-way along bicycle boulevards. Traffic control devices such as stop signs create <br />predictability for the road user. <br />NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY <br />OF REDWOOD CITY, AS FOLLOWS: <br />1.Pursuant to the provisions of Section 20.34 of the Redwood City Code, the <br />City Manager is hereby authorized and directed to install All Way STOP controls at the <br />following intersections in the Centennial Neighborhood to be implemented in conjunction <br />with the Centennial Neighborhood Microsurfacing Project: <br />Arguello Street & E Street <br />Arguello Street & C Street <br />Lenolt Street & E Street <br />Lenolt Street & D Street <br />Lenolt Street & C Street <br />Lenolt Street & B Street <br />Lenolt Street & A Street <br />Warren Street & Standish Street <br />Warren Street & Samson Street <br />Warren Street & Alden Street <br />Allerton Street & Howland Street <br />Allerton Street & Standish Street <br />Allerton Street & Samson Street <br />Allerton Street & Alden Street