My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt08 Contract Office Group, Inc
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2008
>
Agmt08 Under $60K
>
Agmt08 Contract Office Group, Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2008 1:39:32 PM
Creation date
5/8/2008 1:39:32 PM
Metadata
Fields
Template:
Agreement
Contractor Name
James Rossillon
PROJECT NAME
Redwood Shores Community Library
Date
4/28/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />ORIGINAL <br /> <br />CONTRACT <br /> <br />City of Redwood City <br /> <br />Site Address: <br />Redwood Shores Community Library <br />399 Marine Parkway <br />Redwood City, CA <br /> <br />PROCUREMENT AND INSTALLATION <br />OF FURNITURE AND FURNtSHINGS FOR <br />THE REDWOOD SHORES COMMUNITY LIBRARY PROJECT <br /> <br />This Agreement is made thisA8 day of lip" I Z. , 2008 between the CITY OF <br />REDWOOD CITY, a charter city and municipal corporation in the State of California ("Owner" or "City"), <br />and CONTRACT OFFICE GROUP, INC., a California corporation ("Contractor"). The work described in <br />Section 1 below shall be performed in accordance with the all plans, specifications and other contract <br />documents attached to or Incorporated into this Contract. <br /> <br />In February 2008, the City issued a Request for Proposals for the procurement and installation of <br />furniture and furnishings for the Redwood Shores Community Library (the 'Work"). <br /> <br />The follOWing documents are Incorporated into and made part of this Contract by this reference: <br /> <br />. Request for Proposals dated February 25, 2008 <br />. Contractor's Proposal Form dated April 23. 200B <br />. Schedule of Work <br />. Noncolluslon Affidavit <br />· Contractor's certificate regarding workers compensation <br />· Certificate of Insurance and Endorsements <br /> <br />The documents shall be referred to collectively as the "Contract Documents". <br /> <br />SECTION 1 - SCOPE OF WORK <br /> <br />Contractor shall furnish all necessary management, supervision, labor, materials, tools, supplies, <br />equipment, plant, services, engineering, testing and/or any other act or thing required to diligently <br />and fully perform and complete the work described in the Request for Proposals. <br /> <br />Contractor shall comply with all requirements of the Contract Documents. Where there is a conflict <br />between the requirements of the several Contract Documents, the more stringent requirements shall <br />govern. <br /> <br />Contractor's scope of work includes, but is not limited to, the following: <br /> <br />· Submit all required samples, product data, certificates, operations and maintenance instructions, <br />guarantees, and other submittals no later than five (5) days after the date the City issues a Notice <br />to Proceed. <br /> <br />· Protect all materials to be used in the Work in accordance with the specifications. <br />
The URL can be used to link to this page
Your browser does not support the video tag.