My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2014-07-28 Closed, Special and Joint SA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2014
>
AgdaPkt 2014-07-28 Closed, Special and Joint SA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2014 9:34:48 AM
Creation date
7/24/2014 3:03:33 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
7/28/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
409
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.1.A. - Page 2 <br /> Caltrans approved the City's request for authorization to proceed with construction on <br /> May 29, 2014. <br /> ANALYSIS <br /> The purpose of this project is to increase safety of children walking and bicycling to <br /> Hoover Community School and to encourage more students to walk and bicycle. See <br /> attached map for the location of the project area. <br /> Four (4) bids were received for the Hoover Safe Routes to School Project on July 2, <br /> 2014. The bid results are summarized in the table below. <br /> Bidder Bid Amount <br /> Granite Rock $411,370.00 <br /> O'Grading Paving, Inc. $423,885.00 <br /> J.J.R. Construction, Inc. $427,000.00 <br /> FBD Vanguard Construction $457,905.50 <br /> Engineer's Estimate $435,098.00 <br /> Recommended Bidder: Granite Rock Company <br /> Substantiation: Granite Rock Company is the lowest responsive and responsible bidder. <br /> The apparent low bid was determined based on the Total Base Bid. The total base bid <br /> of $411,370.00 from Granite Rock Company is 5% lower than the engineer's estimate of <br /> $435,098 for the cost of construction. Based upon the bids received, staff believes that <br /> the low bid of $411,370 is reasonable and recommends awarding the contract to <br /> Granite Rock Company. <br /> Construction is anticipated to begin at in late August and conclude in November 2014. <br /> Notification of the proposed work will be mailed to area residents in early August 2014. <br /> The contractor will coordinate directly with school staff on impacts to school circulation. <br /> Updates on the progress of construction will be available on the city's website. <br /> To support implementation of the project design through construction, staff negotiated <br /> an amendment to the design services contract with Bellecci & Associates. Through this <br /> amendment, Bellecci will provide construction support, inspection, and construction <br /> management services. <br /> In addition to the contracts: <br />
The URL can be used to link to this page
Your browser does not support the video tag.