My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2014-07-28 Closed, Special and Joint SA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2014
>
AgdaPkt 2014-07-28 Closed, Special and Joint SA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2014 9:34:48 AM
Creation date
7/24/2014 3:03:33 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
7/28/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
409
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.B. - Page 93 <br /> residences as shown in Figure 4.2 -2 of the Draft EIR (p. 36), would reduce the Project's <br /> noise impacts but not to less than significant levels. In accordance with CEQA <br /> Guidelines Section 15093, the Planning Commission must make a Statement of <br /> Overriding Considerations as discussed in Attachment 1. <br /> Under CEQA, noise measurements of existing conditions are taken to establish the <br /> baseline noise conditions of a project site and vicinity. It is against this baseline that <br /> anticipated project and cumulative noise impacts are measured to determine the level of <br /> impact significance on the environment. It should be noted that at the time the noise <br /> readings were taken, the Montessori preschool was in session and had a student <br /> enrollment of 10 students. Under CEQA, baseline noise readings can only take into <br /> account the existing noise conditions at the time the noise readings are taken and does <br /> not factor in the maximum allowable enrollment of the Montessori preschool (40 <br /> students) as part of the baseline determination. Therefore, it is conceivable that if the <br /> Montessori preschool was at their maximum allowable student enrollment of 40 <br /> students at the time the noise readings were taken, baseline noise readings would have <br /> been much higher than what was actually measured with 10 students, and the <br /> significance of the Project's potential noise impacts would be less compared to the <br /> noise impacts that have been identified for the Project. <br /> Summary of Project Alternatives. The Draft EIR analyzed three alternatives and a No <br /> Project Alternative as follows: <br /> 1. No Project Alternative: In accordance with CEQA Guidelines Section <br /> 15126(d)(4), the Final EIR evaluated a No Project Alternative (Summary section <br /> on p. 3 and Section 7.2 on p. 93 of the Draft EIR), which shall address both the <br /> existing conditions, as well as what would be reasonably expected to occur in the <br /> foreseeable future if the Project is not approved, based on current plans and <br /> consistent with available infrastructure and community services. Two scenarios <br /> were evaluated under the No Project Alternative: The No Development Scenario <br /> and the Development Under Existing Zoning Scenario. Under the No <br /> Development Scenario, no new development would occur on the project site, the <br /> church and Montessori Preschool would continue to operate on the site, and <br /> there would be no new environmental impacts. Under the Development Under <br /> Existing Zoning Scenario, because existing development on the project site <br /> includes a vacant classroom building and schools are permitted on the property <br /> with approval of a Use Permit, it is reasonably foreseeable that a school could be <br /> operated on the site in the future, as evidenced by the expiration of the <br /> previously approved school, Woodside Hills Christian Academy (Project No. <br /> UP2007 -29), the Montessori Preschool currently operating onsite with an <br /> approved Use Permit (Project No. UP2011 -28), and the historical use of the <br /> property as a school site. In addition, the operation of a school in the future on <br /> the project site could result in a significant unavoidable noise impact similar to <br /> the Project's noise impacts as described in the EIR. Staff recommends that the <br /> Planning Commission reject this alternative as infeasible because it is not likely <br /> to avoid or substantially lessen the Project's sole significant and unavoidable <br /> impact (noise), and it would not achieve the City's and the Project Applicants' <br /> objectives for the Project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.