My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2014-09-22 Closed and Joint with SA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2014
>
AgdaPkt 2014-09-22 Closed and Joint with SA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2014 9:05:08 AM
Creation date
9/18/2014 4:12:06 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
9/22/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
329
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />RFP Pan Am Barge Removal – due 20 June 2014 Page 6 of 22 <br />to complete work described in Attachment A (Scope of Work). Include similar <br />information for any projected subcontractor. <br /> <br />This section should also include a Profile of Lawsuit, Litigation, Injury, or Fatality: <br />• List any lawsuit or litigation and result of that action that is still pending or <br />has occurred within the last five (5) years. <br />• List all projects where claims or settlements were paid by the firm or its <br />insurer’s within the last five (5) years. <br />• List all work related injuries or fatalities in the last five (5) years. <br /> <br />5.3. Qualifications of the Firm and all subcontractors. <br />Describe the Proposer’s and sub-Proposer’s qualifications and previous experience <br />on similar or related projects. Provide descriptions of pertinent project experience <br />with other public municipalities and private sector clients in the last two (2) years. <br />This includes a summary of the work performed, the total project cost, the <br />percentage of work the firm was responsible for, the period over which the work <br />was completed, and the name, title, phone number of clients to be contacted for <br />references. <br /> <br />5.4. Proposal Cost <br />This is a turn-key project. Unless otherwise specified, all costs for fees, permits, <br />materials and subcontractors required to perform the entire project will be included <br />in the Proposal. <br /> <br />5.5. Safety <br />Proposal must thoroughly address Proposers commitment to personal, property and <br />environmental safety. Successful Proposer will submit Safety Plan, specific to this <br />project not later than fourteen (14) days after award. Safety Plan must be approved <br />by the City before actual work commences. <br /> <br />6. Contract Type and Method of Payment <br />It is anticipated that the contract resulting from this RFP, if awarded, will be in the form <br />attached to this RFP as Attachment C and will be a lump sum agreement with payments based <br />on 100% of the work completed, accepted by the City and unconditional lien release(s) <br />provided by all contractors and subcontractors.. No mobilization or phased payments will be <br />considered. <br /> <br />Payment to the successful Proposer shall be made upon successful and satisfactory completion <br />of all work as outlined in Attachment A (Scope of Work) with a total fee as set by the Proposer <br />in the Proposal or as negotiated between the Proposer and the City as being the maximum cost <br />to perform all work. Unless otherwise expressly indicated in writing by the City, this figure shall <br />include all direct costs and overhead, such as, but not limited to, insurance, equipment, <br />7.1.D. - Page 17
The URL can be used to link to this page
Your browser does not support the video tag.