My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2014-09-22 Closed and Joint with SA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2014
>
AgdaPkt 2014-09-22 Closed and Joint with SA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/7/2014 9:05:08 AM
Creation date
9/18/2014 4:12:06 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
9/22/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
329
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Silverado Contractors, Inc. Page 3 <br />demolished. All work was scheduled to be complete in a period of six months and was <br />completed on time. <br />Client: San Jose State University <br /> <br />Macy’s Union Square, San Francisco, CA (1997-1998): Project Manager <br />The interior demolition of a 12-story building and removal of exterior masonry walls. <br />Structural concrete removal and drilling to facilitate new seismic work. The Owner <br />requested additions to the original contract to remove the interiors of the sales floors of <br />adjacent buildings as part of the overall shopping center modernization. <br />Client: Swinerton Walhberg Company <br />7.1.D. - Page 40
The URL can be used to link to this page
Your browser does not support the video tag.