PARKS & RECREATION DEPARTMENT MONTHLY REPORT <br /> DESIGN AND DEVELOPMENT <br /> MARCH 1977 <br /> Redwood Shores Park Development <br /> The construction work at Dolphin Parks I , II , and III and for the first <br /> phase of Marlin II continues , however at a somewhat slower pace . The <br /> local rains which fell during the month of March delayed the work to <br /> some degree . The installation of the sprinkler system is continuing <br /> and should be completed by the middle of April . Final grading will then <br /> be accomplished and access walks will be installed . The play apparatus <br /> area in Dolphin II has been installed ; however , the play equipment has <br /> not as yet been put into place . Every effort is being made to urge the <br /> contractor to move ahead as rapidly as possible to complete this con - <br /> struction work . <br /> Mezes Park <br /> The contractor is awaiting delivery of materials for the new picnic tables <br /> and benches . Some work has been accomplished on the turf areas and some <br /> of the landscaping in order to produce an acceptable job . Recent rains <br /> have delayed the work ; however , it is felt that this phase of the park <br /> construction can be completed prior to the end of April . <br /> Canyon Park <br /> The construction drawings for the first phase development of Canyon Park <br /> are now complete . A meeting has been scheduled for the first week of <br /> April with the consultant for a final review of the plans and to ini - <br /> tiate the plan checking process for the work . <br /> The worsening drought situation together with mandated water rationing <br /> will result in further evaluation of this project by the Design & Devel - <br /> opment Committee together with the Parks & Recreation Commission as to <br /> the feasibility of initiating this project at this time . Recommenda - <br /> tions regarding the project will be confirmed as soon as possible . <br /> - 6- <br />