My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2014-10-20 Closed and Special Joint with SA_Revised_10_17_2014
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2014
>
AgdaPkt 2014-10-20 Closed and Special Joint with SA_Revised_10_17_2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2014 2:13:26 PM
Creation date
10/16/2014 4:39:00 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency
Date
10/20/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.1.B. - Page 13 <br /> 2. Define geotechnical investigation parameters and provide to CITY to acquire <br /> geotechnical report for use in the design of the Project. <br /> 3. Review as -built / record documents and other pertinent reports / documents <br /> relevant to the Project site. <br /> 4. Provide digital topographic survey for the Project. <br /> 5. Develop existing conditions base plan for the Project. <br /> 6. Coordinate with CITY Community Development Department staff to define, <br /> research and coordinate environmental review, CEQA compliance, coordination, <br /> process and obtain certifications required by the State, CiTY and other <br /> responsible entities for the Project. <br /> 7. Determine methodology for synthetic turf material selection acceptable to CiTY. <br /> TASK 2 — INITIAL DESIGN (50% DESIGN SUBMITTAL) <br /> This initial design will be used as the basis for the development of the Final Design. The <br /> tasks Consultant shall complete include, but are not limited to, the following: <br /> 1. Attend one meeting with CITY to review findings and Project recommendations <br /> from TASK 1. Provide meeting agenda and meeting minutes for review by CITY. <br /> 2. Set -up CAD background files and applicable drawing sheets for Project. <br /> 3. Develop 50% Construction Document (CD) Submittal package (three hard copy <br /> sets and 1 electronic pdf file). The package will include, but not be limited to, the <br /> following: <br /> a. Cover sheet <br /> b. Existing conditions plans <br /> c. Demolition plans <br /> d. Grading and drainage plans <br /> e. Layout/ material plans <br /> f. Electrical drawings <br /> g. Construction details <br /> h. Technical specifications <br /> i. Identification of possible staging areas <br /> j. Temporary construction easements <br /> k. General and construction notes <br /> I. Construction phasing options <br /> m. Preliminary statement of probable construction costs. <br /> 4. Design calculations and analysis will include all of the following: <br /> a. Engineering calculations; <br /> b. Any miscellaneous technical data; <br /> c. Maintenance considerations; and, <br /> d. Catalogue cuts for any special equipment. <br /> REV: 10 -03 -14 MLG <br /> Page 11 of 15 <br /> ATTY /AGR.2014.200Nerde Design, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.