Laserfiche WebLink
Mezes Park <br /> The final review of the construction drawings and specifications for Phase II <br /> of Mezes Park has been slightly delayed pending the removal of the caboose from <br /> Red Morton Community Park . In that the construction of the restroom facilities <br /> at Red Morton Park will be a part of the contract for the Phase II construction <br /> of Mezes Park , final drawings for the project are dependent upon the disposition <br /> of the caboose . This should be determined by the second week of April , and <br /> if current schedules are met , the caboose should be removed from the area prior <br /> to the end of April . These projects are being combined into one contract in <br /> order to reduce the cost of both jobs . <br /> Senior Center Architectural Studies <br /> The Senior Center Committee met on three different occasions during the month <br /> of March with the architectural consultant , Kingsford Jones , relative to the <br /> initial phases of the architectural studies . The Committee considered a series <br /> of space requirements for the various activities proposed for the Center , as <br /> well as determined the priorities for space allocation for the Center . Considera - <br /> tion was given both to the initial phases of the project , as well as to the final <br /> Master Plan for Alternate Development . <br /> Architect Jones offered many suggestions to the Committee and presented a <br /> comparative analysis of Redwood City ' s proposed project with other projects , <br /> so that the Committee could obtain greater insight into the complexities of <br /> the Senior Center Structure . <br /> The architect will now prepare preliminary sketches which will incorporate the <br /> space requirements and priorities arrived at by the Committee . The Committee <br /> at their next meeting will review the preliminary sketches of the possible <br /> floor plans utilizing existing structures , together with considering a completely <br /> separate structure . The sketches should be ready for review the latter part <br /> of April or the first part of May . <br /> -7 - <br />