My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
PRC MIN 1976-03-10
RedwoodCity
>
Park and Rec Commission
>
Parks & Rec Comm Minutes
>
1970-1978
>
1976
>
PRC MIN 1976-03-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2014 9:50:00 AM
Creation date
12/4/2014 9:49:10 AM
Metadata
Fields
Template:
Park and Rec Comm
Park and Rec Comm - Document Type
Minutes
Date
3/10/1976
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mezes Park <br /> The final review of the construction drawings and specifications for Phase II <br /> of Mezes Park has been slightly delayed pending the removal of the caboose from <br /> Red Morton Community Park . In that the construction of the restroom facilities <br /> at Red Morton Park will be a part of the contract for the Phase II construction <br /> of Mezes Park , final drawings for the project are dependent upon the disposition <br /> of the caboose . This should be determined by the second week of April , and <br /> if current schedules are met , the caboose should be removed from the area prior <br /> to the end of April . These projects are being combined into one contract in <br /> order to reduce the cost of both jobs . <br /> Senior Center Architectural Studies <br /> The Senior Center Committee met on three different occasions during the month <br /> of March with the architectural consultant , Kingsford Jones , relative to the <br /> initial phases of the architectural studies . The Committee considered a series <br /> of space requirements for the various activities proposed for the Center , as <br /> well as determined the priorities for space allocation for the Center . Considera - <br /> tion was given both to the initial phases of the project , as well as to the final <br /> Master Plan for Alternate Development . <br /> Architect Jones offered many suggestions to the Committee and presented a <br /> comparative analysis of Redwood City ' s proposed project with other projects , <br /> so that the Committee could obtain greater insight into the complexities of <br /> the Senior Center Structure . <br /> The architect will now prepare preliminary sketches which will incorporate the <br /> space requirements and priorities arrived at by the Committee . The Committee <br /> at their next meeting will review the preliminary sketches of the possible <br /> floor plans utilizing existing structures , together with considering a completely <br /> separate structure . The sketches should be ready for review the latter part <br /> of April or the first part of May . <br /> -7 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.