My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt04 Overland Pacific Cutler
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2004
>
Agmt04 Under $60K
>
Agmt04 Overland Pacific Cutler
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2008 4:19:40 PM
Creation date
5/10/2004 11:30:26 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Overland Pacific & Cutler
PROJECT NAME
consulting
RMP File Number
304.5
Date
3/29/2004
Box
6585
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Preparation of a Project Plan <br />OPC will perform a cost and benefit analysis for temporary versus permanent <br />relocation, of the mobile homes and their occupants, to allow a determination of course <br />of action by the City. <br />Preparation of a Relocation Plan <br />Under California Relocation Law and Guidelines, when a project will result in the <br />permanent displacement of residential occupants, a Relocation Plan must be prepared. <br />If it is determined by the Project Plan that the occupants of the mobile homes will be <br />permanently displaced, OPC will prepare the required Relocation Plan which includes <br />the following: <br />. Personally interview all Project occupants to obtain required information, I.e., <br /> names, ages and gender of occupants, household composition and income, <br /> special needs, etc. <br />. Conduct resource study to determine likelihood of availability of comparable <br /> replacement housing and incorporate results into the Plan. <br />. Analyze survey results and incorporate data into a written Plan. <br />. Prepare a detailed description of the relocation advisory services program, a plan <br /> for any extraordinary housing which may be required. <br />. Incorporate initial Project planning, analysis and preparation to minimize potential <br /> legal, financial and administrative difficulties. <br />. Provide required number of draft and final Plans to City of Redwood City and <br /> others, as required for review and comment. <br />. As needed, attend all required meetings (Le" with tenants and City of Redwood <br /> City) associated with the preparation or adoption of the Plan. <br />. Incorporate the ultimate findings of the Project Plan. <br />Residential Relocation Services <br />If the occupants are to be permanently displaced, it will be necessary to either acquire <br />the mobile homes from the owners (or move the mobile homes to a permanent off-site <br />replacement site) and provide relocation assistance to the occupants, In either case, <br />OPC will provide relocation assistance services as follows: <br /> Page 4 of7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.