My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso PC15-08 PC Reso (3086 ) 1305 El Camino
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2015
>
Reso PC15-08 PC Reso (3086 ) 1305 El Camino
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2015 11:49:04 AM
Creation date
5/20/2015 11:47:06 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
Date
5/15/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
construction. Traffic control for lane closures shall conform to the Work Area Traffic <br /> Control Handbook. Street closures require submission of traffic control plans and <br /> approval in advance. [SDR][ENGINEERING] <br /> 48. Grading—Grading shall be performed in accordance with Volume Ill, Part II of the City's <br /> Engineering Standards. Soil or other construction materials shall not be stockpiled in <br /> the public right-of-way. The applicant shall submit cut/fill volumes (CY) for all soils to <br /> be imported to or exported from the site. [SDR][ENGINEERING] <br /> a. Monitoring - The Soils Engineer shall conduct continuous site inspections <br /> during trenching and backfill operations at the applicant's expense. The Soils <br /> Engineer shall take compaction tests and submit the results to Engineering & <br /> Construction. [SDR][ENGINEERING] <br /> 49. Public Parking During Construction - The applicant shall apply for Parking Meter <br /> Construction Zone Hoods prior to removing any public parking spaces from public use <br /> during construction. Parking meter construction zone hoods shall be issued upon <br /> payment of a deposit of $10.00 per hood issued, refundable upon return of the hoods, <br /> and a nonrefundable fee of$3.00 per day per hood issued. [SDR][ENGINEERING) <br /> 50. Construction Coordination—The applicant shall coordinate the proposed design with <br /> other developments in the area, especially at conform locations, in order to provide a <br /> consistent design for the overall area. The applicant shall coordinate construction <br /> sequencing to the maximum extent practicable to provide for smooth transitions <br /> between adjacent projects during all phases of construction, to reduce impacts to public <br /> access (vehicular and pedestrian) during construction, and to avoid reconstruction of <br /> recently constructed improvements. [SDR](ENGINEERING] <br /> 51. Construction Noise—The applicant shall comply with the following construction-period <br /> noise abatement measures: [SDR][BUILDING] <br /> a. Construction Plan. Prepare a detailed construction plan identifying the <br /> schedule for major noise-generating construction activities. The construction <br /> plan shall identify a procedure for coordination with nearby noise-sensitive <br /> facilities so that construction activities and the event schedule can be <br /> scheduled to minimize noise disturbance. This plan shall be provided to all <br /> noise-sensitive land uses within 500 feet of the construction site. <br /> b. Construction Equipment Mufflers and Maintenance. Equip all internal <br /> combustion engine-driven equipment with intake and exhaust mufflers that are <br /> in good condition and appropriate for the equipment. <br /> c. Equipment Locations. Locate stationary noise-generating equipment required <br /> on construction project sites as far as possible from sensitive receptors when <br /> sensitive receptors adjoin or are near a construction project site. <br /> d. Quiet Equipment Selection. Use quiet construction equipment, particularly air <br /> compressors, wherever feasible. <br /> e. Temporary Barriers. Construct solid plywood fences around construction sites <br /> adjacent to residences, operational businesses, or noise-sensitive land uses. <br /> f. Temporary Noise Blankets. Temporary noise control blanket barriers should be <br /> erected along building facades of construction sites to attenuate noise from <br /> elevated activities if noise conflicts cannot be resolved by scheduling. (Noise <br /> control blanket barriers can be rented and quickly erected.) <br /> ATTY/RES0.3086/PC RESO 1305 EL CAMINO <br /> REV:05-14-15 VR <br /> Page 12 of 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.