Laserfiche WebLink
<br />ATTY/AGR/2015/AMENDMENTS/AMEND NO.2/ MIG INNER HARBOR SPECIFIC PLAN <br />REV: 06-11-15 VR <br />Page 4 of 9 <br />4. Direct Costs Related to Completed Additional Services <br />Increase of direct costs related to the completed additional services and includes <br />materials prepared for the additional task force meetings, travel costs for Consultants <br />participation at the SLR meeting, and travel costs associated with the attendance <br />additional MIG personnel at the Task Force meetings. <br /> <br />Costs associated with the above tasks are provided in Table 1. <br /> <br />Additional Specific Plan and Related Services <br />In addition to planning services already provided to the Inner Harbor Specific Plan <br />project, Consultant will provide the additional services. Costs associated with these <br />tasks and services are provided in Table 2. <br /> <br />Task 6: Administrative Draft Specific Plan <br /> <br />6.1.1 Additional Administrative Draft Specific Plan Review/Response <br />Consultant will address the expanded number and breadth of City comments on the <br />Administrative Draft Specific Plan. This augmented task allows for: <br />• 36 hours of graphic support to determine and/or illustrate if automobiles or <br />street/field lights can be seen from Maple Drive when looking towards the <br />Steinberger Slough; <br />• Additional Consultant participation with the Implementation Chapter (up to 20 <br />hours); and <br />• Fuscoe Engineering (FEI) to revise infrastructure exhibits per City staff <br />comments and update Specific Plan text and exhibits to reflect improvements <br />proposed by the utility model analysis. <br /> <br />6.3 Sea Level Rise Coordination, Allowance <br />Consultant will coordinate with Environmental Science Associates (ESA) to integrate <br />the SLR component into other sections of the Specific Plan, as required. An allowance <br />of 39 hours has been budgeted. If additional time is necessary, it will be invoiced on a <br />time and materials basis. Cost savings from other tasks may be applied to additional <br />work within this task, if necessary. Additional work outside of the total budget <br />established for the contract amendment shall not be conducted without prior written <br />authorization from the City’s Project Manager. <br /> <br /> <br />6.4 Additional Graphics <br />Consultant will prepare a series of graphic vignettes as identified below to illustrate the <br />vision for the Inner Harbor neighborhood: <br />• Pedestrian path adjacent to Redwood Creek and Inner Harbor-1 (Inner Harbor-1 <br />represented as two- or three- story townhomes). Walkers, bicyclists may be <br />included. <br />• View of Redwood Creek with kayakers, marsh, sea wall. <br />7.1.G. - Page 7