My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Transcript04 2004-05-24
RedwoodCity
>
City Clerk
>
Minutes
>
2000-2009
>
2004
>
2004 council mtg transcripts
>
Transcript04 2004-05-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2006 10:35:42 AM
Creation date
6/23/2004 9:49:26 AM
Metadata
Fields
Template:
CC Index
Agency Type
City Council
Date
5/24/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> REPORTER'S TRANSCRIPT OF PROCEEDINGS TAKEN 5-24-04 <br />1 240 feet, which is really one of the tallest <br />2 buildings along the Peninsula. <br />3 There's some concern about school impacts. <br />4 Even though there was an independent consultant's <br />5 report that concluded that the project would really <br />6 generate very few school-aged children, the Redwood <br />7 City School District has requested that the City <br />8 work to designate a certain site in the area, and <br />9 also to contribute toward bussing costs. <br />10 In addition to that, there is the concern <br />11 about density. The density is higher than what is <br />12 normally allowed in Redwood City; however, we have <br />13 to remember, in order to create active and good <br />14 places, a higher density is really what's needed. <br />15 Urban design is an issue in the sense that <br />16 at each phase it's going to come back before the <br />17 City for further review and making sure it's <br />18 consistent with the Precise Plan. <br />19 A~d, of course, there's the issue of water <br />20 supply. And I want to ~mphasize that we have told <br />21 the developer and it's clear that there's no <br />22 guarantee of water for this project. In fact, at <br />23 each phase the developer would have to come in and <br />24 we'll have to reaffirm that fact and there would be <br />25 a water study at each phase of the project. <br /> UCCELLI & ASSOCIATES 24 <br /> (650) 952-0774 <br /> .. <br />
The URL can be used to link to this page
Your browser does not support the video tag.