My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Ord04 2264
RedwoodCity
>
City Clerk
>
Ordinances
>
2000-2009
>
2004
>
Ord04 2264
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2012 9:36:15 AM
Creation date
6/29/2004 12:46:52 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Ordinance
Agency Type
City Council
Date
6/28/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> Appendix B - Project Conditions <br /> Traffic and Transportation b) A minimum of twenty percent (20% ) of the project's required 1 <br /> contributions for the widening of East Bayshore Road and j <br /> 29. The applicant shall pay all required Traffic Mitigation Fees prior the Hwy. 101 pedestrian/bike undercrossing shall also be <br /> to issuance of building permits for each phase of the develop- made prior to Final Map approval for the initial phase of <br /> ment. development. The remainder of funding contributions for <br /> roadway improvements shall be made prior to the Final Map î <br /> 30. Streets, street lights, parking places and all accessories within approval that includes the SOOth residential unit for the : <br /> the subdivision shall be private and shall be maintained by the proj ect. <br /> homeowner and/or commercial business associations. <br /> 32. The applicant shall construct or reconstruct adjacent (except <br /> 31. The applicant shall contribute funds for the construction of off- Highway 101) and on-site roadways to the specifications out- <br /> site roadway, pedestrian/bicycle, traffic and signalization im- lined in the Precise Plan. Schematic design plans for the road- <br /> provements, as outlined in the Precise Plan. The applicant's con- ways shall be submitted at the time of Tentative Map and/or <br /> tribution for each improvement shall be based on the relative Planned Community Permit applications. Detailed design and <br /> peak hour impacts as compared with other proposed and antici- construction plans shall be submitted for review and approval <br /> pated projects. The actual contribution will be determined at the by the City prior to Final Map approval. The construction of Bair <br /> time of Final Map approvaP Island Road shall be completed to the satisfaction of the City <br /> prior to occupancy of the initial phase of development. Bair Is- <br /> a) The required contribution to the Blomquist extension and land Road shall, to the greatest extent practicable, be centered <br /> bridge over Redwood Creek shall be made either prior to on the existing right-of-way and additional right"of-way shall <br /> Final Map approval for the initial phase of development or be dedicated approximately equally from property owners on <br /> when the funds are needed by the City to commence project both sides of the road. The City shall determine the preåse align- <br /> construction. At a minimum, however, 20% of the project's ment and right-of-way dedication shall be required prior to Fi- <br /> required contributions for the Blomquist Extension shall be nal Map approval. <br /> provided prior to Final Map approval and the remainder shall <br /> be provided not later than Final Map approval that includes 33. Adequate right-of-way along the project side ofBair Island Road <br /> the SOOth residential unit for the project. shall be dedicated for future bicycle and pedestrian faooties. <br /> Such faooties may include an on-street Class 2 bike lane and <br /> off-street sidewalk, or may be a Class 1 off-street combined bike <br /> 3 For the purposes of these conditions, "Final Map approval" means and pedestrian path. Dedication of right-of-way shall be made <br /> City approval of compliance with all applicable subdivision re- at the time of Final Map approval, and the bike and pedestrian <br /> quirements, including but not limited to, design of improvement paths shall be shown with the initial Tentative Map and Planned <br /> plans, bonding for or construction of improvements, preparation Community permit applications. Detailed design and construc- <br /> of supporting legal restrictions (such as covenants, conditions tion plans shall be submitted for review and approval by the <br /> and restrictions), and payment of fees, as typically are required City prior to Final Map approval of the initial phase of develop- <br /> prior to map recordation. ment. <br /> - 94 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.