Laserfiche WebLink
<br /> 1 <br /> Î <br /> Appendix B - Project Conditions <br /> I <br /> 1 sures shall be completed to the satisfaction of those agencies prior to issuance of building permits for that phase of the devel- <br /> I prior to occupancy of related development phases. opment. <br /> , <br /> I <br /> 21. All required permits from Federal and State agencies, including 25. An Acoustical Study for residential components of the project <br /> ! but not limited to Section 10 and 404 permits from the U.S. Army shall be prepared to identify insulation features sufficient to <br /> i <br /> I Corps of Engineers, a Section 401 Clean Water Certification or maintain interior noise levels at or below 45 Ldn for all residen- <br /> Waiver from the California Regional Water Quality Control tial development. The study must be submitted to the satisfac- <br /> , Board, and/or a 1603 Streambed Alteration Agreement from the tion of the City prior to issuance of building permits for each <br /> I California Department Fish and Game, needed to address loss phase of the development. <br /> 1 of estuarine navigable waters, saline emergent wetlands, and/ <br /> I or fresh water emergent wetlands (see Mitigation Monitoring 26. A qualified archaeologist shall be retained by the project appli- <br /> Program for details) shall be obtained prior to issuance of any cant to monitor on-site building foundation, marina, infrastruc- <br /> I building permits for the initial phase of the project. Any required ture, and other excavation work. In the event that cultural re- <br /> construction elements of the project shall be reflected on the sources are encountered, work in the immediate vicinity must <br /> I project plans, and any required off-site mitigation measures shall be stopped and the archaeologist shall evaluate the finds. Any <br /> be completed to the satisfaction of those agencies prior to occu- discovery or disturbance of any cultural resources shall be re- <br /> I pancy of related development phases. ported and mitigation measures taken as outlined in the Mitiga- <br /> I <br /> I tion Monitoring Program and further described in the project <br /> 22. School impact fees, per State law and local district requirements, Environmental Impact Report (EIR). The applicant shall comply <br /> I shall be paid prior to issuance of building permits for each phase with the requirements of the City's Cultural Resources Man- <br /> 1 of residential development. agement Plan related to anyon-site discovery, reconnaissance <br /> , and identification of any cultural resources. <br /> I <br /> I 23. A Notice of Proposed Construction or Alteration shall be sub- <br /> mitted to the Federal Aviation Administration (FM), and FM 27. Plans to control demolition and construction period dust emis- <br /> I confirmation that the plans do not conflict with aviation require- sions in accordance with Bay Area Air Quality Management <br /> ments shall be submitted to the City prior to issuance of build- District (BMQMD) guidelines shall be incorporated into project <br /> I ing permits for each phase of the development that proposes plans, to the satisfaction of the City, prior to issuance of building <br /> buildings with heights of 185 feet or more. permits for each phase of the development. <br /> ., <br /> I Addiôonal Environmental Requirements 28. All measures outlined in the Marina Shores EIR Mitigation Moni- <br /> toring Program (MMP), adopted by the City Council on June 7, <br /> I 24. Residential project plans shall include chutes for recyclable ma- 2004, are hereby incorporated as conditions of approval for this <br /> terials next to garbage chutes or in alternative convenient loca- project. These measures are generally outlined in the conditions <br /> I tions (subject to the requirements of the recycling companies). of approval, but further details are available in the MMP and the <br /> I Planned Community Permit applications shall include plans background and intent of the measures are described in the En- <br /> showing the location of such facilities, to be verified by the City vironmental Impact Report. <br /> I <br /> - 93 - <br /> I <br />