Laserfiche WebLink
<br />ATTY/RESO.3157/601 Marshall Appeal 8-Story Project <br />REV: 11/10/15 VR <br />Page 15 of 22 <br />58. Key boxes shall be installed where access to or within a structure is restricted <br />because of secured openings or where immediate access is necessary for life saving <br />or firefighting purposes. (CFC 506.1) Recessed key boxes shall be installed at all <br />building entrances five to six feet above finished grade. <br />59. Applicant shall comply with all City, State and Federal regulations, applicable to the <br />Project, related to: fire and life safety, ADA requirements, and all general building <br />code regulations as per the State Building Code as adopted and amended by the City <br />of Redwood City. <br />60. A landscaping and irrigation plan shall be included in the Building Permit submittal. <br />61. Tree protection measures shall be provided for all trees to remain near the project <br />that are 12” in diameter and larger. These measures shall be shown on the building <br />permit plans and coordinated with the City’s Landscape Architect. <br />62. The applicant shall hire a qualified biologist to conduct a survey for nesting birds prior <br />to tree removal or trimming, and submit the survey for filing. All tree removal and <br />trimming shall take place outside of the breeding season. <br />63. The applicant shall obtain a Tree Removal Permit for the removal of any existing on- <br />site trees that are 12” in diameter and larger. <br />64. New exterior lighting requires final review by the City prior to building permit <br />issuance. As part of the Building Permit submittal package, the applicant shall <br />provide a lighting plan including cut-sheets for all new fixtures, as well as <br />photometric evaluation site plan demonstrating that light levels are appropriate for <br />the use and that the new light sources do not introduce glare or light effects that spill <br />off the property. <br /> <br />Prior to Building Permit Issuance: <br />65. The owner/applicant shall pay all applicable water, recycled water, and wastewater, <br />related fees outlined on the City’s web site at <br /> http://www.redwoodcity.org/departments/community-development- <br />department/engineering-transportation/engineering/engineering-standards. <br />66. The owner/applicant shall pay a Traffic Mitigation Fee based on the schedule set by <br />City Ordinance chapter 18, article XV, or as determined by Traffic Study. <br />67. The applicant shall pay $25,000 per space to the City of Redwood City for the <br />requested 118 in-lieu parking spaces not being provided on the project site (total <br />$2,950,000.) Total in-lieu parking fee is required prior to issuance of first project <br />Building Permit. <br />68. The project site is currently made up of multiple parcels. No structures are allowed to <br />be built across property lines. Prior to the issuance of any building permit, the <br />applicant shall prepare a Parcel Map in accordance with the Subdivision Map Act and <br />7.C. - Page 27