Laserfiche WebLink
PS15 - - 1 <br /> PS13 - 1 - <br /> PS4 - 1 - <br /> PS5 - 1 - <br /> PS6 - 1 - <br /> PS3 2 - 1 <br /> Central Branch <br /> PS7 - 7 - <br /> PS8 - 1 - <br /> PS9 - 1 - <br /> PS10 1 - - <br /> East Branch <br /> PS16 - 1 - <br /> PS18 - 1 - <br /> PS17 1 1 1 <br /> Northwest Branch <br /> PS21 - 1 - <br /> PS20 - 1 - <br /> PS19 1 1 - <br /> North Branch <br /> PS24 - 1 - <br /> PS23 - 1 - <br /> PS22 1 1 - <br /> Seaport Centre/Pacific Shores <br /> Pacific Shores2 - 1 <br /> Pacific Shoresl - - - <br /> Seaportl - 1 - <br /> Seaport 2 - 1 - <br /> Marina PS 1 1 - <br /> SVCW Maple PS 1 - - <br /> TOTAL 10 23 3 <br /> The flow meters and the rain gauges shall be installed at the approved sites <br /> and visited weekly during the monitoring period. Consultant shall report to the <br /> City within 24 hours of each site visit if any meter has malfunctions or otherwise <br /> fails to provide good data, or if changes in site conditions have impacted <br /> collection of good data. Field calibration data (independent measurements of <br /> flow depth and velocity) shall be collected throughout the monitoring period for <br /> each meter to verify monitor accuracy over a range of flow depths. The flow <br /> data will be collected at 5-minute intervals and reported at 15-minute intervals. <br /> The meters will be interrogated at each site visit and the data (considered <br /> preliminary) will be provided to the City for review on a weekly basis within <br /> three (3) days after interrogation. At the City's discretion, the data submittals <br /> may be reduced to a biweekly basis after the first two (2) weeks if the initial <br /> data appears to be good. The final data shall be compiled following removal of <br /> the flow meters and the rain gauge. In the event that more than one flow meter <br /> REV:11-23-15 VR <br /> Page 10 of 14 <br /> ATTY/AGR.2015.258N&A Consulting Engineers, Inc. <br />