My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt16 BKF Engineers
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2016
>
Agmt16 BKF Engineers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2016 5:11:30 PM
Creation date
2/17/2016 5:11:28 PM
Metadata
Fields
Template:
Agreement
Contractor Name
BKF Engineers
PROJECT NAME
Redwood Creek Branch and Jefferson Branch of 2016 Redwood Creek Repair and Rehabilitiation Project
RMP File Number
304
Date
2/12/2016
MO Ref
16-022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
and depth of the utilities. <br /> Deliverables: <br /> Hard and digital (AutoCAD) copies of the topographic base mapping shall be <br /> submitted. ' <br /> TASK 3—INITIAL DESIGN (50%and 75%DESIGN SUBMITTAL) ' <br /> This initial design will be used as the basis for the development of the Final Design. <br /> The tasks include, but are not limited to, the following: <br /> 1. Consultant shall develop 50% and 75% Design Submittal which shall include, but <br /> not limited to, demolition and disposal plan, general and construction notes, <br /> connection details, construction details and sections of new concrete slab and <br /> wall, site restoration work , bracing system, profile plans technical specifications, <br /> possible staging areas, and estimate of construction costs. The design <br /> calculations and analysis should include all final engineering calculations, any <br /> miscellaneous technical data, maintenance considerations and catalogue cuts for <br /> any special equipment. ' <br /> 2. Consultant shall review existing creeks conditions, observations, data, findings <br /> and recommendations. '. <br /> 3. Consultant shall conduct site visits to the creeks site to assess and analyze the <br /> condition and provide recommendations and altemative methods for repair. <br /> 4. Consultant shall comply with utility permitting agencies requirements such as with ' <br /> Department of Fish and Wildlife, U.S. Army Corps of Engineers and Water Boards. <br /> (Please refer to utility agencies permit requirements included in the City's request , <br /> for proposal package.) ' <br /> 5. Consultant shall coordinate with City's previous consultants regarding previous <br /> creek observations when necessary. <br /> 6. Consultant shall coordinate with the City's Community Development Department <br /> and Public Works Department when necessary. <br /> 7. Consultant shall prepare for review by City, 50% and 75% complete construction <br /> drawings consisting of plan views, profiles, cross-sections, construction notes, <br /> detailing of major components, utility connection points, specification outline, <br /> construction cost estimates, construction schedule and other documents, <br /> R��T(Y1'�R�VpZ6.010/BKF Engineers <br /> Paae 14 of 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.