My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2016-04-11 Closed and Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2016
>
AgdaPkt 2016-04-11 Closed and Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2016 10:49:17 AM
Creation date
4/7/2016 5:09:28 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
4/11/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />ATTY/AGR/2016.063/SSA LANDSCAPE ARCHITECTS <br />REV: 03-29-16 FF <br />Page 11 of 16 <br />m. Meet with the CITY to review the Final Design Plan, Cost Estimate, and Construction <br />Phasing Plan and discuss strategies for moving forward. <br />n. Provide coordination and administrative support during this phase of work with the CITY <br />and design team. <br />o. Provide QA/QC review time for each submittal during this phase of work. <br /> <br />Task Two Deliverables <br /> <br />1. (2) Preliminary SD Concepts, Cost Estimates, and Color Renderings (PDF and full size <br />hard copies on boards) <br />2. (1) Final Design Plan, Cost Estimate, and Color Rendering Board (PDF and full size <br />hard copies on boards) <br />3. Construction Phasing Plan (PDF) <br />4. (1) Final Design Plan, Cost Estimate, and Color Rendering Board (PDF and full size <br />hard copies on boards) <br />5. (6) CITY meetings, with minutes as outlined above: <br /> (4) CITY coordination meetings <br /> Community Workshop #2 <br /> Community Workshop #3 <br />TASK THREE – Design Development for Phase One <br /> <br />a. Facilitate the updated topographic survey work for the limits of Phase One. <br />b. Prepare the Design Development plans, including the following information, which may <br />be combined onto consolidated sheets as feasible: <br /> <br /> Existing Conditions and Demolition Plan <br /> Conceptual Site Plan <br /> Accessibility Plan <br /> Conceptual Materials & Finishes Schedule (including samples) <br /> Conceptual Playground Design <br /> Conceptual Landscape Plan (plant palette + irrigation equipment / intent) <br /> Conceptual Grading and Drainage Plan (including C3 / LID improvements as <br />required) <br /> Conceptual Lighting Plan <br /> Conceptual Construction Cost Estimate <br /> Preliminary Construction Schedule (Gantt chart) <br /> Technical Specifications Table of Contents <br /> <br />c. Perform DD level QA/QC plan check. <br />d. Attend (2) design coordination meetings with the CITY and design team. <br />e. Prepare color renderings of proposed design to include a brief written narrative, (1) plan <br />view, (2‐3) perspective sketches, and several character images. <br />f. Attend (1) Commission or Council hearing to assist the CITY as requested to answer <br />questions and present the Phase One project. <br />g. Provide administrative support and coordination time required to perform these services. <br /> <br />Task Three Deliverables <br /> <br />1. Updated Topographic Survey (CAD and PDF) <br />6.1.D. - Page 14
The URL can be used to link to this page
Your browser does not support the video tag.