My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2016-04-11 Closed and Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2016
>
AgdaPkt 2016-04-11 Closed and Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2016 10:49:17 AM
Creation date
4/7/2016 5:09:28 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
4/11/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />ATTY/AGR/2016.063/SSA LANDSCAPE ARCHITECTS <br />REV: 03-29-16 FF <br />Page 12 of 16 <br />2. Design Development Drawings (PDF and 1 full size hard copy) <br />3. Conceptual Construction Cost Estimate (PDF) <br />4. Preliminary Construction Schedule (PDF) <br />5. Color Rendering Boards (PDF and 1 full size hard copy mounted) <br />6. (3) CITY meetings, with minutes where noted above: <br /> (2) CITY coordination design meetings <br /> (1) Commission or Council hearing <br /> <br />TASK FOUR – Construction Documentation for Phase One <br /> <br />a. Prepare and submit the 65% Construction Documentation plans, including the following <br />information, which will be submitted through all City departments for review and <br />comment: <br /> <br /> Existing Conditions and Demolition Plan <br /> Site Plan <br /> Accessibility Plan <br /> Materials & Finishes Plan <br /> Playground Enlargement Plan <br /> Layout Plan <br /> Planting Plan <br /> Irrigation Plan <br /> Grading Plan <br /> Drainage Plan <br /> Erosion Control Plan <br /> Lighting Plans <br /> Construction Details <br /> Construction Cost Estimate <br /> Construction Schedule <br /> Technical Specifications <br /> <br />b. Perform 65% QA/QC plan check. <br />c. Attend (1) 65% plan review meeting with the CITY and design team. SSA will furnish <br />meeting minutes. <br />d. Prepare 95% Construction Documents (including all items listed in task 4.a above). The <br />CITY will use this submittal to complete internal permitting requirements. <br />e. Perform 95% QA/QC plan check on site with the plan set and design team. <br />f. Receive and review CITY comments and permit comments for incorporation into final <br />documents. <br />g. Prepare 100% Construction Documents. <br />h. Perform 100% QA/QC plan check. <br />i. Prepare Final Bid Set drawings. <br />j. Prepare Front End Specifications, including the following: <br /> <br /> Bid Proposal <br /> Division O Specifications <br /> Division 1 Specifications <br /> Contractor Qualifications <br /> List of technical reports, permits and other information available to the Contractor, <br />with disclaimer <br /> Engineer’s estimate of construction costs <br />6.1.D. - Page 15
The URL can be used to link to this page
Your browser does not support the video tag.