My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt16 SSA Landscape Architects
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2016
>
Agmt16 SSA Landscape Architects
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2019 10:20:52 AM
Creation date
4/18/2016 12:34:51 PM
Metadata
Fields
Template:
Agreement
Contractor Name
SSA Landscape Architects
PROJECT NAME
Red Morton Westside Renovation Project Landscape Architecture seervices
RMP File Number
304
Date
4/13/2016
MO Ref
16-059, 17-162, 18-032, 19-077
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2. Design Development Drawings (PDF and 1 full size hard copy) <br /> 3. Conceptual Construction Cost Estimate (PDF) <br /> 4. Preliminary Construction Schedule (PDF) <br /> 5. Color Rendering Boards (PDF and 1 full size hard copy mounted) <br /> 6. (3) CITY meetings, with minutes where noted above: <br /> ■ (2) CITY coordination design meetings <br /> ■ (1) Commission or Council hearing <br /> TASK FOUR—Construction Documentation for Phase One <br /> a. Prepare and submit the 65% Construction Documentation plans, including the following <br /> information, which will be submitted through all City departments for review and <br /> comment: <br /> ■ Existing Conditions and Demolition Plan <br /> ■ Site Plan <br /> ■ Accessibility Plan <br /> ■ Materials 8� Finishes Plan <br /> ■ Playground Enlargement Plan <br /> ■ Layout Plan <br /> ■ Planting Plan <br /> ■ Irrigation Plan <br /> ■ Grading Plan <br /> ■ Drainage Plan <br /> • Erosion Control Plan <br /> ■ Lighting Plans <br /> ■ Construction Details <br /> ■ Construction Cost Estimate <br /> ■ Construction Schedule <br /> ■ Technical Specifications <br /> b. Perform 65% QA/QC plan check. <br /> c. Attend (1) 65% plan review meeting with the CITY and design team. SSA will furnish <br /> meeting minutes. <br /> d. Prepare 95% Construction Documents (including all items listed in task 4.a above). The <br /> CITY will use this submittal to complete internal permitting requirements. <br /> e. Perform 95% QA/QC plan check on site with the plan set and design team. <br /> f. Receive and review CITY comments and permit comments for incorporation into final <br /> documents. <br /> g. Prepare 100% Construction Documents. <br /> h. Perform 100% QA/QC plan check. <br /> i. Prepare Final Bid Set drawings. <br /> j. Prepare Front End Specifications, including the following: <br /> ■ Bid Proposal <br /> ■ Division O Specifications <br /> ■ Division 1 Specifications <br /> ■ Contractor Qualifications <br /> ■ List of technical reports, permits and other information available to the Contractor, <br /> with disclaimer <br /> ■ Engineer's estimate of construction costs <br /> ATTY/AGR/2016.063/SSA LANDSCAPE ARCHITECTS <br /> REV:03-29-16 FF <br /> Page 12 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.