My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2016-04-25 Closed and Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2016
>
AgdaPkt 2016-04-25 Closed and Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2016 10:48:55 AM
Creation date
4/22/2016 3:39:15 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
4/25/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
596
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1.C. - Page 12 <br /> The inspection will be recorded digitally to an external hard drive and shall become property of the City. <br /> At the beginning of each inspection,the information of the inspection shall be displayed in the following <br /> PACP format: <br /> A. Surveyed By <br /> B. Street <br /> C. Locations Code <br /> D. Direction of inspection <br /> E. Pipe material <br /> F. Pipe diameter <br /> G. Length of reach to be televised <br /> H. Manhole number from which the camera is traveling <br /> I. Manhole number to which the camera is traveling <br /> J. Pipe ID <br /> K. Inspection Time/Date <br /> In addition,each recording shall continuously display the following information: <br /> A. City <br /> B. Number of the manhole from which the camera is traveling <br /> C. Number of the manhole to which the camera is traveling <br /> D. Direction of flow(indicated by arrow) <br /> E. Date of recording <br /> F. Pipe diameter <br /> G. Pipe material <br /> H. Footage <br /> CONTRACTOR shall take at least one picture of all mid-to-major defects in pipe that will be in JPEG <br /> format.Each JPEG file will be named in accordance with the line and footage.One photograph shall also <br /> be taken of each lateral connection looking up into the lateral. <br /> CONTRACTOR shall setup at the upstream manhole whenever possible to video inspect with the flow. <br /> The camera will move at a uniform rate at a speed no greater than 30 feet per minute.Distance of the line <br /> will be measured and recorded from the center of manhole to the center of the next manhole.The distance <br /> will be accurate within 2 feet of every 1000 linear feet inspected. If more than one manhole reach is <br /> inspected in a sir gle run, the footage counter shall be reset to zero at the center of all intermediate <br /> manholes. The camera shall pause for a sufficient amount of time to adequately document and provide <br /> accurate distance measurements of all defects in pipe and the connections observed in the line. The <br /> camera shall rotate and look directly at each defect and look into each connection to thoroughly document <br /> the conditions and determine if the lateral is in service. CONTRACTOR shall capture photos of any <br /> moderate and above damages or abnormal conditions. <br /> The recording shall include an audio portion describing the condition of the lines with the video image. <br /> The audio portion will be sufficiently free of background noise to produce an oral report that is clear and <br /> easily discernible. At the beginning of each inspection run, the audio shall identify CONTRACTOR'S <br /> name, the crew member, date, time, street location, name of line, pipe size,pipe material, direction of <br /> inspection, and the pipe numbers at the beginning and end of the reach. The audio shall note during the <br /> inspection the location and condition of the pipe defects, including all cracks, breaks, cracked or <br /> misaligned joints,root intrusion,infiltration,missing pieces of pipe,corrosion,deposits,obstructions,and <br /> any other items which reflect the condition of the sewer line. The audio shall also note the location of the <br /> connections,and whether the connection is in service.All observations shall be included on the inspection <br /> report. <br /> REV:03-16-16 VR <br /> Page 9 of 12 <br /> ATTY/AGR.2016.052/Professional Pipe Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.