My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt16 IPS
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2016
>
Agmt16 IPS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2016 3:25:43 PM
Creation date
5/19/2016 3:13:02 PM
Metadata
Fields
Template:
Agreement
Contractor Name
IPS
PROJECT NAME
Parking Meter
RMP File Number
304
Date
5/19/2016
MO Ref
16-077
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
IPS will comply. <br /> 3.5 PROJECT SITE CONDITIONS <br /> A. MSM components shall operate dependably within environmental conditions indigenous to installed <br /> site location as described herein. Components located in a 24-hour climate controlled office shall be <br /> capable of normal performance in a business environment. Outdoor equipment shall be capable of <br /> operating in temperature and weather extremes and marine environment in Redwood City, California. <br /> IPS complies. IPS meters have been independently certified to operate in all climate types including <br /> temperatures ranging from -40°F to 140°F. <br /> 3.6 TIME OF COMPLETION <br /> A. Substantial Completion <br /> A certificate of substantial completion for the MSM or for major subsystems will not be provided until <br /> the following requirements have been satisfied as stipulated in Part 3 of this section: <br /> 1. Applicable system or major subsystems have passed the SAT test. <br /> IPS will comply. <br /> 2. All communications from equipment to CMS and City-furnished workstations has passed the SAT <br /> test. <br /> IPS will comply. <br /> 3. CMS produces all required reports and has passed the SAT test. <br /> IPS will comply. <br /> 4. Integrated PARC system including MSMs, handheld monitoring devices, subsystems including <br /> alternates and credit card clearinghouse for payment card transactions has passed the SAT test. <br /> IPS will comply. <br /> 5. Proof/Certification of PCI compliance. <br /> IPS complies. Please see the Appendix for copies of our PCI compliance. <br /> 6. All spare parts, stock material and manuals are on site and have been approved by City. <br /> IPS will comply. <br /> 7. All training is complete to City's satisfaction. <br /> IPS will comply. Please see below for the proposed training plan. <br /> xxiv. Training <br /> IPS will provide as much training (both on-site and web-based) as required by the City, including additional <br /> sessions, specialized sessions customized to the needs of the City, both before, during and after MS 1 pay <br /> station deployment. Additionally, IPS can provide multiple trainers to conduct even more sessions if <br /> necessary. Most IPS training sessions are a combination of onsite classroom and hands on use of MS 1 pay <br /> stations and management system, including manuals for reference material. As new features are deployed, <br /> additional training sessions can be established at mutually agreeable times to provide updates and refresher <br /> REV: 05-05-16 JS <br /> Page 85 of 177 <br /> ATTY/AGR.2016.094/IPS Group <br />
The URL can be used to link to this page
Your browser does not support the video tag.