My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
CC MIN 1971
RedwoodCity
>
City Clerk
>
Minutes
>
1970-1979
>
1971
>
CC MIN 1971
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2016 12:52:41 PM
Creation date
8/1/2016 8:40:27 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Minutes
Agency Type
City Council
Date
1/18/1971
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
383
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
119 <br /> COMMUNITY PROGRESS REPORT <br /> Redwood Shores . City Manager advised that Mr . James Reiter , of DMJM , would <br /> give a status report on Redwood Shores construction , and that as previously <br /> reported, virtually all public works items had been nearly completed . <br /> Mr . Reiter reported briefly on five efforts and their <br /> standing : Marlin Subdivision No . 1 is recommended by <br /> their staff for acceptance , and final negotiations for <br /> payment of contract under way . Bridge Parkway Bridge and <br /> Bridge Connections completed and accepted by Council . <br /> Marlin Subdivision No . 2 was completed , and pending <br /> final arrangements and testing of force main which runs <br /> alongside . Fifth project was the Winter Maintenance <br /> program which they are prepared to recommend for <br /> acceptance , and expect to have before Council formally <br /> the following week . He indicated this more or less <br /> concluded public works which have been under way for <br /> the past several years , and efforts now would be to <br /> closely monitor progress of builders , and assist home <br /> owners , as well as take care of housekeeping duties <br /> until additional homes are built . Then they would be <br /> prepared , if feasible , to recommend for another bond <br /> sale . A number of design and study task orders have <br /> been closed out with only a few remaining which are <br /> expected to be completed in the next thirty days . He <br /> concluded with remarks commending City , Manager for the <br /> fine working relationship over the several years since <br /> the project began . <br /> City Manager advised that representatives of Leslie Properties , Inc . , had <br /> indicated there was no significant new material to report at this time . <br /> They were moving ahead with homes and it was expected new residents will <br /> soon be moving into these subdivisions . <br /> Seismic Advisory Board Schedule . City Manager was advised by the Chairman <br /> that in one capacity or another , all members have reviewed results of the <br /> San Fernando area earthquake and findings would be incorporated in their <br /> report and that some of the facts have been made available for the first <br /> time because of excellent instrumentation relatively close to the damaged <br /> area . They will be working into June and would make a comprehensive report <br /> shortly after that time . <br /> San Carlos Airport Expansion Plans . City, Leslie Properties and County staffs <br /> have been reviewing this for some time . Still at staff level , but the National <br /> Airport Plan, which has been approved by Federal Aviation Administration , pro- <br /> grams this airport to have a runway 3 , 000 feet long so as to accommodate 95% <br /> of general aviation aircraft . The present 2 , 600 foot runway would therefore <br /> ( � have to be extended an additional U00 feet . County owns the land for the <br /> extension , but to maintain required clearance above the dike in vicinity of <br /> the extension , the dike will need to be relocated, and a small portion filled <br /> inboard of the dike . The extension will also change the FAA classification <br /> and requires additional clearance at each end , and this basically was how <br /> Redwood City became involved . Planning Commission has reviewed the expansion <br /> plans and Commissioners feel they would have minimal effect on the adjacent <br /> properties if extended at the South end toward Whipple Avenue . They also <br />
The URL can be used to link to this page
Your browser does not support the video tag.