My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
CC MIN 1971
RedwoodCity
>
City Clerk
>
Minutes
>
1970-1979
>
1971
>
CC MIN 1971
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2016 12:52:41 PM
Creation date
8/1/2016 8:40:27 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Minutes
Agency Type
City Council
Date
1/18/1971
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
383
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
259 <br /> and designating the week. of September 12 through September 19 , 1971 <br /> as "AFS Week " . <br /> COMMUNITY PROGRESS REPORT <br /> City Manager briefly reviewed his written report previously submitted <br /> to Council ( for full text see City Clerk ' s file - Council Miscellaneous ) <br /> Peninsula & Bridge Parkway Landscaping proceeding satisfactorily , and <br /> by authorization of Council , a change order had been issued to add <br /> construction of Parkway Fencing Section 2 to the project . Repair of <br /> Peninsula. & Bridge Parkways , which had been damaged during construction <br /> of the Strategic Consolidated Sewerage outfall main , was in process of <br /> being repaired by the contractor , Stockton Construction Co . , and com- <br /> pletion was anticipated by the end of. September . Plans and specifications <br /> for Neighborhood Park No . 2 , to be constructed in Dolphin Subdivision , <br /> have been completed , and after review by Staff will be presented to <br /> Council for authorization to accept bids in October . DMJM has reviewed <br /> to ascertain the project will be within the budgeted 5106 , 000 . Leslie <br /> Properties has indicated informally they will fund $ 31 , 500 of the <br /> project . With regard to the request of U . S . Geological Survey to <br /> conduct subsurface geophysical surveys within Redwood Shores , City <br /> Manager advised that action by Council was being requested to authorize <br /> execution of a permit to USGS , and this had been strongly recommended <br /> by the Seismic Advisory Board . The survey would involve running three <br /> seismic refraction profiles across the south bay to determine depth and <br /> configuration of bedrock and to evaluate earlier gravity surveys that <br /> indicated the presence of several buried faults . Staff was preparing <br /> a letter permit which would cover insurance , time limits and notification <br /> requirements . Included would be a paragraph protecting buried equipment <br /> which could be damaged by the small charges which will be set off for <br /> energy source . Mr . Donald Nichols , of USGS , has assured staff that only <br /> persons in close proximity to the site would be aware of the detonations . <br /> Homeowners Association has been notified with respect to time schedules , <br /> and it was hoped that the press would publish those times . Work was <br /> anticipated to start on Wednesday , September 15 , in six locations , and the <br /> experiment would last three weeks . According to experts , it was felt this <br /> was a worthwhile set of experiments to assist in seismic knowledge . Staff <br /> felt there was an obligation to assist , as long as the public is protected . <br /> Councilman Keckley moved to adopt RESOLUTION NO , 6587 APPROVING AND AUTHORIZING <br /> EXECUTION OF A REVOCABLE PERMIT TO UNITED STATES DEPARTMENT OF THE <br /> INTERIOR GEOLOGICAL SURVEY TO CONDUCT GEOLOGICAL STUDIES ON CERTAIN CITY <br />
The URL can be used to link to this page
Your browser does not support the video tag.