Laserfiche WebLink
322 <br />cities are to authorize inclusion in proposed agreement. Councilman Arnett questioned <br />Item 11 which related to "other agreements between members", and City Librarian advised <br />this was inserted at the request of Daly City because of a pre-existing contract between <br />them and the County dealing with exchange of services, and does not involve City of <br />Redwood City. Motion carried on roll call vote, Councilman Henderson being noted absent, <br />BID OPENING, Sale of Surplus Cast Iron Lead Joint Water Fittings <br />Staff report had been submitted to Council in which it was stated no bids had been <br />received. City Manager advised that subsequent to time of the bid opening and the de- <br />termination that no bids had been received, the City Assessor reappraised the material <br />at scrap value of $200,00, <br />In the opinion of Staff, the fittings should be sold as a single item for scrap, based <br />on economics of manpower involved, and City Manager requested Council permission to <br />dispose of the items in negotiated sale, being of a value under $250,00, <br />Councilman Petersen moved to accept recommendation of Staff, seconded by Councilman <br />Keckley and carried. (MINUTE ORDER #70-139) <br />Bridge Parkway Bridge connections and associated work, GID 1-E4 <br />City Manager reported plans and specifications had not been signed by the Director <br />of Public Works because of a difference of opinion concerning access for Bridge <br />Parkway into the parcel immediately to the right of the turn onto the Bridge from <br />Marine World Parkway, presently planned as site for a service station. In the <br />plans as submitted by DMJM, a 50' wide opening is provided off Bridge Parkway <br />into this site, and conforms to arrangement worked out at the time the parcel map <br />was considered. He indicated that the Public Works Director preferred that there <br />not be a direct opening onto the Parkway, but rather a right turn pocket be <br />constructed in Bridge Parkway to allow further turn onto this parcel, He asked <br />Council for guidance, <br />Council asked for recommendation of DMJM, which City Manager responded that it was <br />to provide a 50 -foot opening directly from the Parkway into this site. At present, <br />it was not definite what the on-site plan would be, <br />Mr. <br />James Reiter, of DMJM, <br />reviewed for <br />Council the area <br />in <br />question by reference to <br />a projected <br />drawing, <br />City Manager noted another concern was possibility of problems with someone coming <br />off Marine World Parkway only to find he was not where he wanted to be and attempt <br />to get out. Police Chief concurred, and indicated he considered offset curbs a <br />traffic hazard, except where they are necessary to feed traffic onto a major <br />artery, He recommended the plan as submitted by DMJM. <br />