My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt16 PSD Software, LLC
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2016
>
Agmt16 PSD Software, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2022 11:32:03 AM
Creation date
8/8/2016 10:34:46 AM
Metadata
Fields
Template:
Agreement
Contractor Name
PSD Software, LLC
PROJECT NAME
Hiper Web tracking and support preventative, predictive, corrective and demand Maintenence
RMP File Number
304
Date
8/5/2016
MO Ref
16-057, 18-041, 20-042
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 07-30-2021 RL <br />Asset condition fields are captured during the work order completion process or the inspection <br />process. Asset condition fields will be transposed to the asset record immediately and become <br />available for reporting, analyzing and viewing in a real-time environment. <br />Site condition codes are filtered by service type and will be used to track the before and after <br />condition of the job site or repair. Conditions may be set to trigger additional work orders for <br />future repair or site remediation at the discretion of the City. Consultant will assist the City with <br />trigger setup if requested at no additional charge to the City. <br />Job Cost: <br />A Job Cost module will be provided to track labor hours for regular time and overtime, material <br />charges, equipment charges including FEMA rates, contractor cost, street cut, and journal entries <br />for miscellaneous expenses such as mileage and non-stock items. <br />Invoices will be able to be generated from Consultant’s software for internal and external billing. <br />Job cost and statistical reports will be grouped by asset, location, work type, facility, process, <br />project, address, priority, department, task, condition, crew or other categories specified by the <br />City. Other information such as Job Safety Actions and Equipment Idle time will be captured <br />at the time of closing work orders. <br />All job costs, financial or otherwise will have the ability to impact one or more strategic initiatives. <br />All strategic initiatives will have the ability to impact one or more Key Performance Indicators <br />(KPI) set by the City. These impacts may be simplistic or formulaic in nature. KPIs will be <br />displayable through a dashboard view and presence of KPIs will be configurable based on user <br />credentials. Additionally, Consultant will assist the City in displaying KPI data on a public facing <br />web page at no additional charge if requested by the City. <br />Task Management and Linking Processes: <br />Tasks will be one of the many ways users can track work. Consultant’s software will allow users <br />to manage these tasks efficiently. One of these key features will be the ability to copy or “clone” <br />all details from an existing task to create new ones. This eliminates the time necessary to manually <br />enter the same data for multiple tasks. Users interested in defining processes in more detail will <br />be able to assign an unlimited amount of materials to specific tasks as well as specific labor skills, <br />estimated hours, departments, employees, tools, contractors, attachments, attachments from <br />O&M manuals or CAD drawings, estimated costs, and standard operating procedures (SOP). <br />If a work order calls for a task which has a linked SOP, that SOP will automatically attach to, and <br />print with the work order. The same holds true for parts, skills, tools, contractors, and manuals. <br />Users define and edit all of these elements when setting up each task. <br />Barcode Functionality: <br />Consultant’s software will have the ability to have material from the warehouse scanned, added, <br />and released to a work order using barcode equipment or QR equipment. <br />ATTY/AGR.2021/Amend No. 3/PSD Hiperweb (Page 6 of 16)
The URL can be used to link to this page
Your browser does not support the video tag.