My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso PC16-08 0043 PC Reso 603 Jefferson
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2016
>
Reso PC16-08 0043 PC Reso 603 Jefferson
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:40:22 AM
Creation date
8/24/2016 8:38:51 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
Date
5/17/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTY/RESO.0043/PC RESO 603 JEFFERSON <br />REV: 05-18-16 VR <br />Page 13 of 19 <br />Fire alarm water-flow fire sprinkler signals shall be transmitted to the central station <br />and retransmitted by zone to the public safety communications center. [COA][FIRE] <br />59. Fire Flow – The required fire flow at the minimum residual pressure of 20 psi shall be <br />required (IFC Appendx B). This needed fire flow from a water supply includes <br />both the required fire flow and the demand for the automatic fire sprinkler <br />system. <br />60. Fire Hydrants – The minimum number of fire hydrants and spacing requirements <br />available to the building shall not be less than that listed in International Fire Code <br />Appendix C. <br />61. Elevator Requirements – The following requirements for elevators apply: <br />[SDR][BUILDING][FIRE] <br />a. One elevator shall be available for use as an accessible means of egress in <br />case of emergency. <br />b. All buildings with one or more passenger service elevators shall be provided <br />with not less than one medical emergency service to all landings. The medical <br />emergency service elevator shall accommodate the loading and transport of <br />an ambulance gurney or stretcher (maximum size 24 inches by 84 inches) in <br />the horizontal position. <br />c. One elevator shall be connected to backup generator power in order to remain <br />operable during emergencies. This elevator shall be provided with appropriate <br />signage and shall extend to all floors including the lower levels of the parking <br />structure <br />d. All additional elevators shall be connected to battery backup with sufficient <br />power to bring the elevator to the exit level in the event of an emergency. <br />e. All elevators shall be equipped with smoke curtains. <br /> <br />Construction-Related Activities <br />62. Sales and Use Taxes – For commercial projects with a valuation of over $10 million, <br />register with the Board of Equalization to create an ID prior to project construction and <br />operation. This maximizes the City’s allocation of sales and use taxes associated with <br />project construction. Contact Nancy Murguia, Finance Department, at (650) 780-7097 <br />or nmurguia@redwoodcity.org. [COA][FINANCE] <br />63. Hours of Construction – Construction activity is permitted between 7:00 a.m. and <br />8:00 p.m. Monday through Friday, except as permitted on weekends by the Building <br />Official, and shall adhere to the City’s Noise Ordinance. If possible, the noisiest <br />construction activities would be scheduled for daytime hours when the ambient noise <br />levels are highest. [SDR][BUILDING]
The URL can be used to link to this page
Your browser does not support the video tag.