construction submittals provided by the successful bidder, for conformance <br /> with the scope-of-work. <br /> Task 2.3—Pilot Test Field Oversight/Data Evaluation and Report <br /> • Consultant will conduct pre-construction planning activities with the City, <br /> Regency, and the Contractor, to prepare for the planned pilot test activities. <br /> Consultant will also oversee the fisld work conducted by the Contractor for <br /> conformance with the scope-of-work. It is anticipated that the pre- <br /> construction activities will be performed over a two week period, and that the <br /> field activities will be completed during a two week period. <br /> • Consultant will review the Contractor's pilot test report, and will incorporate <br /> the report findings into the Remedial Design Implementation Plan, below. <br /> Task 2.4—Remedial Design Implementation Plan (RDIP) <br /> • Consultant has already begun preparing a Remedial Design Implementation <br /> Plan (RDIP). Based on results of the pilot test activities, Consultant will <br /> complete the RDIP for approval by RWQCB. <br /> The RDIP document will describe the proposed remedy in greater detail than <br /> the RAP, including: <br /> (1} Detailed description of the remediation construction activities that will <br /> be conducted; <br /> (2) Permits that are required prior to construction, and other pre- <br /> construction activities; <br /> (3) Proposed construction staging and sequencing; <br /> (4)A constnaction schedule; <br /> (5) Required access to Site areas that will be necessary to implement the <br /> remediation work, and the types of access restrictions that will be necessary <br /> in each area; <br /> (6) Site plans and traffic control plans, as necessary; and <br /> (7) Roles and responsibilities of Consultant, its subcontractors, the City, <br /> and the Site owner. <br /> • Consultant will provide a draft of the RDIP document to the City for review. <br /> With the City's comments on the plan, Consultant will prepare a revised draft <br /> RDIP that will be provided to Regency Centers for review and comment. <br /> Consultant will then finalize the RDIP for submittal to RWQCB staff for review <br /> and approval. <br /> Task 2.5— Full Scale Bid Evaluafion/Award <br /> • Consultant will prepare Instnactions to Bidders, and will compile the relevant <br /> remediation plans and documentation, for the City's advertisement of the RFP <br /> for the full-scale remedy implementation. When bids are received, Consultant <br /> will summarize the contractor submittals, and will provide Consultant's <br /> recommendation to the City for contractor selection and award. <br /> Page 11 of 13 <br /> REV:08-17-16 fF <br /> ATTY/AGR.2016.217/GES-Professional Services <br />