My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt02 Nolte Associates (2)
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2002
>
Agmt02 Nolte Associates (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2005 10:50:28 AM
Creation date
5/2/2002 8:58:22 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Nolte Associates
PROJECT NAME
RWS sewer pump stations 1 and 3
RMP File Number
304
Date
4/25/2002
MO Ref
02-71
Box
5971
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PUMP STATIONS #1 AND #33 CITY OF REDWOOD CITY <br />SCOPE OF SERVICES February 19, 2002 <br /> <br />running time measurements from the City's historical records will allow an estimate of the <br />performance of the existing pump. <br /> <br />Six (6) sets of preliminary plans will be presented to the City for 35% review submittal. One <br />meeting is scheduled with the City staff after review of the 35% submittal. <br /> <br />Task 2. Sixty-Five Percent (65%) Submittal <br /> <br />Prepare for review by City, sixty-five percent (65%) complete construction documents consisting <br />of drawings showing all plan views, profiles, cross-sections, general notes, detailing of major <br />components, construction notes, utility connection points, outline specification and other <br />documents, including, but not limited to, details, catalog cuts and product literature for all <br />products, and engineering calculations. <br /> <br />Six (6) sets of sixty-five percent (65) plans, outline specifications, and Engineer's Estimate will <br />be presented to the City for 65% review submittal. A marked set will be returned along with the <br />City staff's comments and/or request for clarifications to Nolte for revision. One meeting is <br />scheduled with the City staff after review of the 65% submittal. <br /> <br />Task 3. One-Hundred Percent (100%) Submittal <br /> <br />Revise material, as necessary, to incorporate review comments received at the sixty-five percent <br />(65%) submittal. Prepare for review by the City one-hundred percent (100%) complete <br />construction documents consisting of drawings showing demolition, site plan view, general and <br />construction notes, connection details, electrical details, structural details, technical <br />specifications, and estimate of construction costs. The design calculations and analysis should <br />include all final engineering calculations, any miscellaneous technical data, maintenance <br />considerations and catalog cuts for any special equipment. The one-hundred percent (100%) <br />complete construction documents shall be ready for signature and submitted to the City for <br />review and approval. A marked set will be returned along with staff s comments and/or request <br />for clarifications for revision. <br /> <br /> One meeting is scheduled with the City staff after review of the 100% submittal. <br /> <br /> Nolte will furnish one (1) set of plans on 4-nfil polyester media and six (6) copies of original <br /> construction documents of the one-hundred percent (100%) completion or revisions. Both sets <br /> of documents will bear the responsible engineer's wet stamp and signature with a license <br /> expiration date. Nolte will also furnish a disk copy of the drawings in AutoCAD 2000, and <br /> specifications in Word 2000. <br /> <br /> and Seuin?\pxorametsanti\Loc:fl Selfings\Tempor~u'y inlerne~ Files\OLK}C\s:o <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.