My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2016-10-17 Closed and Special Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2016
>
AgdaPkt 2016-10-17 Closed and Special Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2016 9:39:39 AM
Creation date
10/13/2016 4:26:58 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council, Redevelopment Agency and Public Financing Authority
Date
10/17/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
430
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF REDWOOD CITY 6.1.A. - Page 19 <br /> BROADWAY PLAZA MIXED-USE PROJECT EIR <br /> EXHIBIT A: SCOPE OF WORK AND COSTS <br /> • Alternatives Evaluation. The alternatives evaluation chapter will include a tabular <br /> comparison of the alternatives impacts, and a qualitative comparison in adequate <br /> detail to provide meaningful distinctions and conclusions. <br /> • CEQA-Mandated Sections. PlaceWorks will prepare assessment conclusions to meet <br /> CECb4 Guidelines for the following mandatory findings: <br /> • Cumulative Impacts <br /> • Growth Inducement <br /> • Unavoidable Significant Effects <br /> • Significant Irreversible Changes <br /> • Impacts Found Not to be Significant <br /> • Organizations and Persons Consulted.This chapter will include agencies and persons <br /> contacted and literature reviewed. <br /> • Report Preparers.This chapter will identify the consultants and staff who prepared <br /> the EIR. <br /> Graphics:In addition to the Project Description figures, it is estimated that approximately <br /> four graphics (primarily maps) will be used to support the evaluation of each <br /> environmental topic. <br /> Task E. Draft EIR <br /> PlaceWorks will incorporate City staff comments on the ADEIR to create the Draft EIR. <br /> PlaceWorks will first submit an electronic copy of a Screencheck Draft EIR for City staff <br /> review. This scope assumes that revisions to the Screencheck Draft EIR will focus on <br /> formatting and editing,not significant changes to the EIR content and analysis. <br /> PlaceWorks will prepare the Public Review Draft EIR based on comments received from <br /> the City on the Screencheck Draft EIR, and will prepare the Notice of Completion. <br /> PlaceWorks will submit up to 25 copies of the Draft EIR,with technical appendices on CD, <br /> as well as an electronic copy for further reproduction by the City. PlaceWorks will also <br /> print 15 copies of the Introduction, Summary, and Project Description and 15 CDs of the <br /> entire document and send them together with the Notice of Completion to the State <br /> Clearinghouse.This scope of work assumes the City will prepare and publish the Notice of <br /> Availability. <br /> Graphics: The Draft EIR will include the same figures as the ADEIR, with any revisions <br /> requested by City staff in their ADEIR comments. <br /> Task F. Public Review <br /> During the CEO,A-required 45-day public review period,Steve Noack will attend a public <br /> hearing with the Planning Commission to present the EIR findings,answer questions,and <br /> note comments received at the hearing.We assume that City staff will schedule hearings, <br /> provide public notice, and prepare staff reports. We are available to attend hearings, <br /> subject to additional billing on a time and materials basis. <br /> PLACEWORKS 7 <br /> ATTY/AGR.2016.251/Placeworks AUGUST 31,201 e <br />
The URL can be used to link to this page
Your browser does not support the video tag.