My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2016-10-17 Closed and Special Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2016
>
AgdaPkt 2016-10-17 Closed and Special Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2016 9:39:39 AM
Creation date
10/13/2016 4:26:58 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council, Redevelopment Agency and Public Financing Authority
Date
10/17/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
430
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Citywide Transportation Plan: Scope of Work B.B. - Page 8 <br /> October 2016 <br /> Page 3 of 21 <br /> diverse range of stakeholders. We will identify any special considerations for each event such as <br /> translation needs, food, and/or childcare. We will update the draft Outreach Plan based on one <br /> round of City comments to produce a final version. <br /> We envision three major waves of outreach: <br /> • Existing conditions listening and learning (to get input on needs and opportunities), <br /> paired with enthusiasm building and outreach list development (to enable ongoing <br /> communication as the Plan evolves and events occur). This wave will include social <br /> media, web and text communication as well as "pop up" events. <br /> • Project analysis and development (to collaborate with stakeholders to refine projects <br /> identified in the first outreach effort, on project design and feasibility). This wave will <br /> include social media, web and text communication as well as walking audits, focus <br /> groups, and living previews. <br /> • Plan review and implementation (to get input on investment and implementation <br /> strategies). This wave will include social media, web and text communication as well as <br /> larger public workshops. <br /> Deliverables:Draft and Final Outreach Plan. <br /> Task B.2: Branding and Fact Sheet <br /> To create a consistent look and feel for the Citywide Transportation Plan,as well as build excitement <br /> and followership, we will develop a logo and print/e-templates to be used with all Plan products. <br /> We will develop alternative logo concepts, and respond to two rounds of consolidated comments <br /> to finalize the logo and associated templates (MS Word and MS PowerPoint). <br /> At the outset of the Plan,we will create a project fact sheet that can be distributed in paper form at <br /> key events and City facilities, as well as electronically via the project website and social media <br /> channels. The fact sheet will be designed to have a unique shape (such as a wheel or the Redwood <br /> City logo) and will be developed in both Spanish and English. We will provide a draft fact sheet <br /> and then respond to one round of a consolidated set of comments to finalize the factsheet. We <br /> will print 1,500 copies. <br /> Deliverables: Draft and final logo and templates. Draft and final electronic fact sheet and <br /> print copies. <br />
The URL can be used to link to this page
Your browser does not support the video tag.