Laserfiche WebLink
affected by potential Plan recommendations. The groups and topics, and timing of the <br /> focus groups, will be selected with the City. The City will provide a meeting room and <br /> coordinate invitations, and provide any needed translation and/or refreshments. <br /> Consultant will document the focus group findings and respond to one set of <br /> consolidated comments. <br /> Deliverables: Preparation for, attendance at, and draft and final summaries of up <br /> to five (5) meetings or focus groups. <br /> Walking Audits <br /> During project development, Consultant will conduct one ( 1 ) day of walking audits at key <br /> locations in the City where pedestrian and/or bicycle enhancements are proposed . This <br /> will likely consist of a morning and afternoon walking audit along key travel corridors, <br /> and would be in addition to data collection that Consultant will be doing in Task C: <br /> Existing Conditions. Key stakeholders will be invited to join some or all of the audits to <br /> provide context and feasibility input. Where possible, the audits will be timed to observe <br /> the locations during the peak time of safety or mobility concern (such as school drop-off <br /> periods). Consultant will document findings with a technical memorandum that includes <br /> maps illustrating our recommendations and respond to one set of consolidated <br /> comments. <br /> Deliverables: Draft and final walking audit route maps. Attendance at up one day <br /> of walking audits. Draft and final summary of findings. <br /> Public Workshops <br /> Consultant will host two (2) Citywide public outreach workshops when the draft Plan has <br /> been assembled and project and policy recommendations are ready for input. The <br /> conceptual agenda for the workshop will include visually rich exhibits with local images, <br /> interactive exercises to investigate preferences and obtain feedback, and opportunities <br /> for education and information sharing. The workshop will be approximately two to three <br /> hours long and will be in a format where the public can drop in and participate at any <br /> time. The Consultant team will facilitate the workshop and will prepare all materials. <br /> Consultant will document the findings, responding to one round of consolidated <br /> comments. Consultant will arrange the meeting space, provide food and refreshments, <br /> and provide advertising printing services. The City will advertise the meetings and <br /> distribute outreach materials to stakeholder groups. Consultant will develop the <br /> advertising material in Spanish and English and provide a Spanish language translator <br /> for each workshop. <br /> Deliverables: Materials for and attendance at up to two (2) public workshops. <br /> Draft and final workshop summaries. <br /> ATTY/AGR/2016.308/FEHR & PEERS CITYWIDE TRANSPORTATION PLAN <br /> REV: 11-03-16 VR <br /> Page 13 of 26 <br />